Water Supply Plan - City of Miami
Water Supply Plan - City of Miami
Water Supply Plan - City of Miami
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table <strong>of</strong> Contents<br />
<strong>Water</strong> Facilities Work <strong>Plan</strong><br />
3.2.4.1 Hialeah Preston Subarea .............................................................3-9<br />
3.2.4.2 Alexander Orr, Jr. Subarea........................................................3-10<br />
3.2.4.3 South Dade Subarea...................................................................3-10<br />
3.3 <strong>Water</strong> Distribution Facilities .................................................................................3-10<br />
3.3.1 Hialeah-Preston Subarea ........................................................................3-10<br />
3.3.2 Alexander Orr, Jr. Subarea.....................................................................3-11<br />
3.3.3 South Dade Subarea................................................................................3-12<br />
3.4 Summary..................................................................................................................3-13<br />
Section 4 – Population and <strong>Water</strong> Demand Projections<br />
4.1 Historical Population ...............................................................................................4-1<br />
4.2 Population Projections .............................................................................................4-1<br />
4.3 Historical <strong>Water</strong> Use ................................................................................................4-2<br />
4.4 <strong>Water</strong> Demand Projections......................................................................................4-2<br />
4.5 <strong>Water</strong> Conservation and Reuse ..............................................................................4-5<br />
4.6 Summary....................................................................................................................4-5<br />
Section 5 –<strong>Water</strong> <strong>Supply</strong> Facilities Work <strong>Plan</strong><br />
5.1 South <strong>Miami</strong> Heights <strong>Water</strong> Treatment <strong>Plan</strong>t and Wellfield ............................5-1<br />
5.2 Alternative <strong>Water</strong> <strong>Supply</strong> Projects.........................................................................5-1<br />
5.2.1 New Upper Floridan Aquifer Reverse Osmosis (RO) WTP................5-7<br />
5.2.1.1 Phase 1 (10 MGD)......................................................................5-7<br />
5.2.1.2 Phase 2 (5 MGD)........................................................................5-7<br />
5.2.1.3 Phase 3 (2.5 MGD).....................................................................5-7<br />
5.2.2 Floridan Aquifer Blending (and ASR) at Alexander Orr, Jr.<br />
<strong>Water</strong> Treatment <strong>Plan</strong>t (7.2 MGD) ..........................................................5-7<br />
5.2.3 Floridan Aquifer Blending Wellfield at Hialeah-Preston<br />
<strong>Water</strong> Treatment <strong>Plan</strong>t (4.7 MGD) ..........................................................5-8<br />
5.2.4 North District Wastewater Treatment<br />
<strong>Plan</strong>t (NDWWTP) (7.0 MGD) ..................................................................5-8<br />
5.2.5 Central District Wastewater Treatment<br />
<strong>Plan</strong>t (CDWWTP) (1.0 mgd) ....................................................................5-8<br />
5.2.6 South District Wastewater Treatment <strong>Plan</strong>t (SDWWTP) ....................5-9<br />
5.2.6.1 Phase 1 (18 MGD)......................................................................5-9<br />
5.2.6.2 Phase 2 (20 MGD)......................................................................5-9<br />
5.2.6.3 Phase 3 (15 MGD)....................................................................5-10<br />
5.2.7 Miscellaneous Projects (19.62 MGD) ....................................................5-10<br />
5.2.7.1 <strong>Water</strong> Conservation/Non-Revenue Potential <strong>Water</strong> Loss<br />
Reduction Program.................................................................5-10<br />
5.2.7.2 Coastal Wetlands Rehydration Demonstration<br />
Project (0.25 MGD)..................................................................5-10<br />
5.2.7.3 Aquifer Recharge Pilot Study (20,000 gpd) .........................5-11<br />
5.3 20-Year Work <strong>Plan</strong> and Capital Improvement <strong>Plan</strong>..........................................5-11<br />
5.4 Conclusion ..............................................................................................................5-11<br />
A ii<br />
KM2738.TOCa.doc<br />
11/26/2007