21.09.2015 Views

SPECIFICATIONS

Tender Documents.pdf - Northern Rockies Regional Municipality

Tender Documents.pdf - Northern Rockies Regional Municipality

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Fort Nelson NRRM BASIC MECHANICAL SECTION 15010<br />

Airport Terminal Building REQUIREMENTS Page: 4<br />

Washroom Renovations<br />

15017 GUARANTEE-WARRANTY<br />

1. Correct promptly at own expense, defects or deficiencies in the work in accordance with the<br />

Warranty requirements of the Contract.<br />

2. The Engineer shall be the judge as to whether the failure is due to defective workmanship,<br />

improper usage or ordinary wear and tear.<br />

3. Make good any damage resulting from defective materials or workmanship.<br />

4. Rectify any deficiencies or omissions in respect to plans or Specifications which may appear<br />

during the guarantee period even though work has been accepted as complete.<br />

15018 SITE VISIT<br />

1. Before submitting prices, visit the site to determine working conditions and existing<br />

constructions. Particular attention shall be paid to proposed methods of construction and<br />

connection to existing system.<br />

2. Claims of lack of knowledge of existing conditions when bidding will not be acceptable as<br />

reason for authorization of extra charges to Contract Price.<br />

15019 SHUTTING DOWN OR CUTTING INTO EXISTING SERVICES<br />

1. No active existing service pipe shall be shut down or cut into without prior arrangement with the<br />

Owner or designated representative who will schedule the work to minimize inconvenience to<br />

Owner. When a critical service must be shut down, this contractor shall be held responsible to<br />

meet scheduled reactivation time. He shall provide overtime work, with no increase to the<br />

contract price if directed by the General Contractor to do so, in order to meet agreed schedules<br />

set for service reactivation.<br />

2. The domestic water systems shall not be shut down for longer than 6 hours in any 24 hour<br />

period, and shut down shall be scheduled between the hours of 9:00 a.m. to 4:00 p.m.<br />

15023 CODES, PERMITS & PLAN APPROVAL<br />

1. All work done under this section of the Specifications shall be in accordance with all National,<br />

Municipal and Provincial Codes applicable.<br />

2. All mechanical equipment furnished shall meet all specific requirements of, and be in<br />

accordance with, the current edition of the British Columbia Energy Efficiency Standards<br />

Regulation issued under the British Columbia Energy Efficiency Act.<br />

3. Abide by all public ordinances, pay all fees, obtain all permits and give all necessary notices to<br />

authorities having jurisdiction. The Contractor shall submit the required number of Drawings<br />

and Specifications to all authorities having jurisdiction for approval purposes.<br />

February 2012 JM BEAN & CO. LTD 1130.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!