SPECIFICATIONS
Tender Documents.pdf - Northern Rockies Regional Municipality
Tender Documents.pdf - Northern Rockies Regional Municipality
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Fort Nelson NRRM MECHANICAL SECTION 15250<br />
Airport Terminal Building INSULATION Page: 5<br />
Washroom Renovations<br />
Jacket:<br />
Insulation shall be protected with a minimum 5mm (0.020”) thick aluminum<br />
jacket attached within 12mm stainless steel band and/or 12mm x 20mm stainless<br />
steel Robertson screws.<br />
Application<br />
Insulation<br />
Aluminum:<br />
On rectangular duct, secure insulation using weld pins (cup head type) at 300mm<br />
on centre (min. 2 rows per side). On round duct, secure insulation using<br />
stainless steel banding at 300 mm on centre.<br />
On rectangular duct, all circumferential and longitudinal seams should<br />
incorporate a standing lap and/or drive cleat system and be installed in a manner<br />
that will prevent water transmission. Cross breaks should be incorporated to add<br />
additional stiffness to the jacket. Screws should not be used where the insulation<br />
vapour barrier can be penetrated. Seal all penetrations of aluminum jacket using<br />
a suitable exterior grade silicone caulking.<br />
7. Duct insulation adhesives and coatings shall be non-toxic as defined by W.C.B. Regulations.<br />
END of SECTION 15250<br />
February 2012 JM BEAN & CO. LTD 1130.10