239<br />

Investment projects<br />

ORGANIZATION OF PRODUCTION OF<br />

AUXILIARY GAS TURBINE ENGINES OF<br />

NEW GENERATION AND SMALLSIZE<br />

POWER GASTURBINE PLANT AT THE<br />

BASIS OF FEDERAL STATE OWNED<br />

UNITARY UFA AGGREGATE ENTERPRISE<br />

GIDRAVLIKA<br />

(Republic of Bashkortostan, city of Ufa)<br />

Period of project realization: 2004–2011<br />

Contact name by the project:<br />

Kholopov V.Y. +7 (347) 223-26-08<br />

Total investment: 600 million roubles<br />

Borrowed funds: 410 million roubles<br />

Production volume:<br />

gas turbine engines from 40 to 90 pieces<br />

a year,<br />

small gas turbine power station –<br />

from 40 to 300 pieces a year<br />

Payback period:<br />

6-7 years<br />

Creation of new jobs: ~ 1500<br />

Project participants:<br />

• Gidravlika Ufa Aggregate Enterprise<br />

• Aerosila Scientifi c Production Enterprise JSC<br />

(town of Stupino)<br />

• Krosna-motor JSC (Moscow)<br />

• Turbina Special Design Department<br />

(Tchelyabinsk)<br />

• Ufa State Aviation Technical University<br />

ORGANIZATION OF PRODUCTION ON<br />

DISPOSAL OF USUAL TYPES<br />

OF HEIGHTENED POWER AMMUNITION<br />

AT AVANGARD FEDERAL STATEDOWNED<br />

ENTERPRISE<br />

(Republic of Bashkortostan, city of Sterlitamak)<br />

ORGANIZATION OF PRODUCTION OF GAS<br />

PUMPING UNITS WITH 20 MW POWER<br />

(Republic of Bashkortostan, city of Ufa)<br />

Period of project realization: 2008–2010<br />

Contact name by the project:<br />

Azgat A. Ibragimov +7 (3473) 25-96-96<br />

Total investments: 467,3 million roubles,<br />

including:<br />

infrastructure: 191,371 million roubles,<br />

purchase of equipment: 237,9 million roubles,<br />

design works:<br />

38,08 million roubles.<br />

Annual volume of resource material,<br />

subject to reclamation:<br />

19500 tons per year<br />

Period of project realization: 2007–2016<br />

Contact name by the project:<br />

Smirnova T.V. +7 (347) 276-73-29<br />

Total investments: 330,5 mln.roubles<br />

Volume of production:<br />

185 pieces (2009-2018)<br />

Payback period:<br />

4,2 years<br />

Payback period:<br />

~ 4,4 years<br />

Creation of new jobs: ~ 850<br />

Creation of additional jobs: ~ 315<br />

Annual volume of electric power<br />

consumption:<br />

6,2 mln. kW.h<br />

Annual volume of gas consumption:<br />

1,2 mln. cub.m<br />

Project participants:<br />

• Avangard Enterprise<br />

Project participants:<br />

• Ufa Engine-building Production Association<br />

(UMPO) JSC<br />

• Motor Federal State Owned Scientifi c<br />

Production Enterprise

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!