EXPORT PRODUCE
EXPORT PRODUCE
EXPORT PRODUCE
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
243<br />
Investment projects<br />
CONSTRUCTION OF BRICKWORKS BASED<br />
ON KELLER COMPANY’S EQUIPMENT<br />
(Republic of Bashkortostan, city of Ufa)<br />
CONSTRUCTION OF CERAMIC FACING<br />
BRICK AND POROUS BLOCKS<br />
PRODUCTION<br />
(Republic of Bashkortostan, Aurgazinsky district)<br />
Period of project realization: 2008–2011<br />
Contact name by the project:<br />
Kalentjev N.L. +7 (347) 292-57-67<br />
Total investments: 959 mln.roubles, including:<br />
equipment purchase – 578 mln.roubles.<br />
buildings and including structures<br />
construction –<br />
263 mln.roubles.<br />
designing and developing clay quarry –<br />
20 mln.roubles<br />
Production volume by 2010:<br />
60 mln. pcs. of brick per year<br />
Period of project realization: 2007–2009<br />
Contact name by the project:<br />
Isaev A.K. +7 (347) 227-10-45<br />
Total investments: 900 mln. roubles<br />
Production volume by 2010:<br />
80 mln. pieces of standard bricks per year<br />
Payback period:<br />
: 4-5 years<br />
Creation of new jobs: ~ 140<br />
Payback period:<br />
12,5 5 years<br />
Creation of new jobs: ~ 60<br />
Annual consumption of electric power:<br />
15 mln. kW. hour<br />
Annual volume of gas consumption:<br />
8,76 mln. cub. m<br />
Project participants:<br />
• Integral JSC – organization of production<br />
• KELLER HCW GmbH (Germany) – supply of<br />
equipment<br />
Annual consumption of electric power:<br />
6 million kW. hour<br />
Annual volume of gas consumption:<br />
10 mln. cub. m<br />
Project participants:<br />
• Ufa Kyzyltash Construction Company LLC<br />
ORGANIZATION OF PRODUCTION OF<br />
POLYMERIC PIPES, ANTICORROSIVE AND<br />
THERMAL INSULATION FOR PLUMBING<br />
FIXTURES SYSTEMS<br />
(Republic of Bashkortostan,<br />
city of Blagoveshchensk)<br />
Period of project realization:<br />
1-st phase 2006–2007<br />
2-nd phase 2008–2010<br />
Contact name by the project:<br />
Shamil Zh. Erzin +7 (34766) 2-16-68, 2-19-68<br />
Total investments: 600 mln. roubles,<br />
including investments in:<br />
equipment purchase: 440 mln. roubles.<br />
infrastructure developing: 160 mln. roubles<br />
Production volume: 2 billion roubles per year<br />
Payback period:<br />
5 years<br />
Creation of new jobs: ~ 400<br />
Annual consumption of electric power:<br />
23,7 million kW. hour by 2011<br />
1-st stage in 2006-2007: extrusion line launched<br />
producing thermal insulated pipes from<br />
expanded polyurethane<br />
Project participants:<br />
• Metkhimtex JSC