24.09.2015 Views

EXPORT PRODUCE

EXPORT PRODUCE

EXPORT PRODUCE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DEVELOPMENT MINING OF YUBILEYNOYE<br />

DEPOSIT FOR OPENCUT MINING OF<br />

COPPER AND SULFUR, BROWN FERROUS<br />

GOLD CONTAINING ORES<br />

(Republic of Bashkortostan,<br />

Khaibullinsky district)<br />

Period of project realization: 2006–2016<br />

Contact name by the project:<br />

Kozlov V.А +7 (34775) 2-40-55<br />

Total investments in 2006-2013:<br />

~ 9,604 bln.roubles<br />

Production volume by 2013:<br />

~ 3 mln. tons of ore per year<br />

Payback period:<br />

6 years<br />

Creation of new jobs:<br />

~ 1600 by 2013<br />

Annual consumption of electric power:<br />

16,7 million kW. hour<br />

Annual volume of gas consumption:<br />

0,4 mln. cub. m<br />

Project participants:<br />

• Bashkirian Copper LLC<br />

• Ural Mining Metallurgical Company LLC<br />

DEVELOPMENT MINING OF OKTYABRSKY<br />

DEPOSIT FOR MINING OF COPPERZINC<br />

ORE<br />

(Republic of Bashkortostan,<br />

Khaibulinsky district)<br />

CREATION OF POULTRY COMPLEX<br />

FOR BREEDING, SLAUGHTER AND<br />

PROCESSING OF TURKEY MEAT<br />

(Republic of Bashkortostan,<br />

Meleuzovsky district)<br />

Period of project realization:<br />

1-st phase 2007–2014 (mine-driving and<br />

construction works)<br />

2-nd phase 2014–2024 (working out of reserves<br />

300m lower than horizon)<br />

Contact name by the project:<br />

Gainullin R.R.+7 (34758) 3-10-11<br />

Total investments: ~ 2,97 billion roubles<br />

Production volume:<br />

~ 44,32 mln. tons of ore per year by 2017<br />

Payback period:<br />

~ 9,2 years<br />

Period of project realization: 2007–2009<br />

Contact name by the project:<br />

Khalikov S.K. +7 (347) 279-80-36;<br />

+7 917-800-55-21<br />

Kashapov I.А. +7 937-343-09-28<br />

Total investments:<br />

~ 1,37 bln. roubles<br />

Borrowed investments: ~ 803,1 mln. roubles<br />

Payback period:<br />

~ 5,84 years<br />

Creation of additional jobs: 395<br />

Creation of new jobs: 437<br />

Annual consumption of electric power:<br />

31,2 million kW. hour<br />

Annual volume of gas consumption:<br />

1,84 mln. cub. m<br />

Project participants:<br />

• Buribaevsky Mining-Concentrating Integrated<br />

Plant JSC<br />

• Ural Mining Metallurgical Company LLC<br />

Project participants:<br />

• Bashkir Poultry Complex named aſter<br />

M. Gafury LLC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!