Investment projects<br />
MODERNIZATION OF PRODUCTION<br />
AT TUIMAZYSTEKLO JSC<br />
(Republic of Bashkortostan, city of Tuimazy)<br />
Period of project realization: 2008–2010<br />
Contact name by the project:<br />
Natalya G. Trefi lova +7 (34782) 7-14-05, 7-37-59<br />
Total investments: 894 mln.roubles,<br />
including:<br />
own funds –<br />
94 mln.roubles<br />
banking credit –<br />
800 mln.roubles<br />
1-st phase (January-March, 2008) – cold repair<br />
of bath furnace №4, repair, modernization and<br />
putting into operation of the functioning glass<br />
tubes extending line;<br />
2-nd phase (April-June, 2008) – cold repair of<br />
bath furnace №1, purchase of glass-forming<br />
machine, putting into operation<br />
3-rd phase (March, 2008 – February, 2009)<br />
construction of bath furnace №8 and purchase<br />
of ampoule line, glass tubes extending line and<br />
bottle lines.<br />
Additional volume of production:<br />
ampoules – 274 mln. pieces per year (increment<br />
to total marketable products – 9,4%);<br />
vessels out of glass mass – 27,1 mln. pieces per<br />
year (increment to total marketable products –<br />
11,8%).<br />
Production volume of fi rst hydraulic class<br />
products, made on new equipment expected<br />
at 640 mln. roubles per year (increase 25,2% to<br />
total commodity output).<br />
Period of payback:<br />
1-st phase – 1,8 years<br />
2-nd phase – 4,2 years<br />
3-rd phase – 1,4 years<br />
Creation of new jobs: ~ 200<br />
Project participants:<br />
• Tuimazysteklo JSC<br />
CONSTRUCTION OF WOODWORKING<br />
INTEGRATED PLANT PRODUCING<br />
PARTICLEBOARD AND OSB<br />
(Republic of Bashkortostan, Askinsky district)<br />
Period of project realization: 2009–2013<br />
Contact name by the project:<br />
Filus K. Ghilfanov +7 (34731) 2-88-28, 2-87-77<br />
Total investments: 3,1 billion roubles<br />
Production volume: 1,5 billion roubles<br />
of marketable products of particleboard and OSB<br />
per year, creation of timber complex to provide<br />
with raw materials up to 500 thousand cub. m<br />
per year.<br />
Payback period:<br />
5 years<br />
Creation of new jobs: ~ 200<br />
Annual consumption of electric power:<br />
1500 kW. hour<br />
Project participants:<br />
• Aghidel M LLC<br />
• Askindrevplit LLC