<strong>International</strong> building costs, in <strong>2016</strong><br />
RMB<br />
USD<br />
(exchange<br />
rate: 6.52)<br />
Retail<br />
Large shopping centre including mall 5,700 870<br />
Neighbourhood incl super<strong>market</strong> 3,600 550<br />
Prestige car showroom 4,000 610<br />
Composite trade rates<br />
Excavate basement (m 3 ) (1800m 3 job) 34 5<br />
Excavate footings (m) 54 8<br />
Concrete in slab (m 3 ) (1500m 3 job) 500 77<br />
Reinforcement in beams (tonne) 4,400 675<br />
Formwork to soffit of slab (m 2 ) 90 14<br />
Blockwork in wall (m 2 ) (10,000 block job) 180 28<br />
Structural steel beams (tonne) 6,500 997<br />
Pre-cast concrete wall (m 2 ) 210 32<br />
Curtain wall glazing incl support system (m 2 ) (1000m 2 job) 1,300 199<br />
Plasterboard 13mm thick to stud wall (m 2 ) (3000m 2 job) 220 34<br />
Single solid core door incl frame and hardware (no) (50 door job) 2,700 414<br />
Painting to walls primer + 2 coats (m 2 ) 48 7<br />
Ceramic tiling (m 2 ) (1000m 2 job) 210 32<br />
Vinyl flooring to wet areas (m 2 ) (500m 2 job) 385 59<br />
Carpet medium tufted (m 2 ) (4500m 2 job) 390 60<br />
Lighting installation (m 2 ) (5000m 2 + job) 320 49<br />
Copper pipe 15mm to wall (m) (1000+ metre job) 60 9<br />
Fire sprinklers (per m 2 ) (5000m 2 job) 200 31<br />
Air conditioning incl main plant (m 2 ) (5000m 2 + job) 510 78<br />
Labour costs<br />
Group 1 Tradesman e.g. plumber, electrician 33 5<br />
Group 2 Tradesman e.g. carpenter, bricklayer 33 5<br />
Group 3 Tradesman e.g. carpet layer, tiler, plasterer 30 5<br />
General labourer 20 3<br />
Site foreman 40 6<br />
Material costs<br />
Concrete 30 MPa (m 3 ) (1500m 3 job) 390 60<br />
Reinforcement bar 16mm (tonne) (120 tonne job) 2,700 414<br />
Concrete block (400x200) per 1000 (>10,000 block job) 4,100 629<br />
Standard brick per 1000 580 89<br />
Structural steel beams (tonne) (100 tonne+ job) 2,850 437<br />
Glass pane 10mm tempered (m 2 ) 500 77<br />
Softwood timber for framing 100mm x 50mm (m) 30 5<br />
13mm plasterboard (m 2 ) 25 4<br />
Emulsion paint (litre) 60 9<br />
Copper pipe 15mm (metre) (1000+ metre job) 35 5<br />
Copper cable (metre) (3C + E, 2.5mm PVC) (100,000m+ job) 8 1.2<br />
Plant<br />
Hire 50t mobile crane + operator (day) 2,300 353<br />
Market:<br />
lukewarm<br />
Tendering:<br />
cooler<br />
Cost escalation 2015–16: -10.0%<br />
Cost escalation <strong>2016</strong>–17: 0.0%<br />
Contractor’s margin: 4.0%<br />
Preliminaries: 5.0%<br />
Location factor (USD): 28<br />
PPP coefficient: 3.00<br />
<strong>International</strong> <strong>construction</strong> <strong>market</strong> <strong>survey</strong> <strong>2016</strong> 31