<strong>International</strong> building costs, in <strong>2016</strong><br />

SGD<br />

USD<br />

(exchange<br />

rate: 1.39)<br />

Retail<br />

Large shopping centre including mall 3,214 2,310<br />

Neighbourhood incl super<strong>market</strong> 2,107 1,520<br />

Prestige car showroom 3,380 2,430<br />

Composite trade rates<br />

Excavate basement (m 3 ) (1800m 3 job) 75 54<br />

Excavate footings (m) 25 18<br />

Concrete in slab (m 3 ) (1500m 3 job) 158 114<br />

Reinforcement in beams (tonne) 1,519 1,093<br />

Formwork to soffit of slab (m 2 ) 37 27<br />

Blockwork in wall (m 2 ) (10,000 block job) 65 47<br />

Structural steel beams (tonne) 4,018 2,891<br />

Pre-cast concrete wall (m 2 ) 142 102<br />

Curtain wall glazing incl support system (m 2 ) (1000m 2 job) 1,365 982<br />

Plasterboard 13mm thick to stud wall (m 2 ) (3000m 2 job) 25 18<br />

Single solid core door incl frame and hardware (no) (50 door job) 845 608<br />

Painting to walls primer + 2 coats (m 2 ) 10 7<br />

Ceramic tiling (m 2 ) (1000m 2 job) 87 62<br />

Vinyl flooring to wet areas (m 2 ) (500m 2 job) 80 58<br />

Carpet medium tufted (m 2 ) (4500m 2 job) 63 45<br />

Lighting installation (m 2 ) (5000m 2 + job) 205 147<br />

Copper pipe 15mm to wall (m) (1000+ metre job) 28 20<br />

Fire sprinklers (per m 2 ) (5000m 2 job) 82 59<br />

Air conditioning incl main plant (m 2 ) (5000m 2 + job) 267 192<br />

Labour costs<br />

Group 1 Tradesman e.g. plumber, electrician 28 20<br />

Group 2 Tradesman e.g. carpenter, bricklayer 20 14<br />

Group 3 Tradesman e.g. carpet layer, tiler, plasterer 28 20<br />

General labourer 17 12<br />

Site foreman 28 20<br />

Material costs<br />

Concrete 30 MPa (m 3 ) (1500m 3 job) 108 78<br />

Reinforcement bar 16mm (tonne) (120 tonne job) 1,176 846<br />

Concrete block (400x200) per 1000 (>10,000 block job) 700 504<br />

Standard brick per 1000 350 252<br />

Structural steel beams (tonne) (100 tonne+ job) 2,156 1,551<br />

Glass pane 10mm tempered (m 2 ) 120 86<br />

Softwood timber for framing 100mm x 50mm (m) 12 9<br />

13mm plasterboard (m 2 ) 8 6<br />

Emulsion paint (litre) 18 13<br />

Copper pipe 15mm (metre) (1000+ metre job) 13 10<br />

Copper cable (metre) (3C + E, 2.5mm PVC) (100,000m+ job) 2 1<br />

Plant<br />

Hire 50t mobile crane + operator (day) 2,000 1,439<br />

Market:<br />

lukewarm<br />

Tendering:<br />

cooler<br />

Cost escalation 2015–16: 0.0%<br />

Cost escalation <strong>2016</strong>–17: 1.0%<br />

Contractor’s margin: 5.0%<br />

Preliminaries: 8.0%<br />

Location factor (USD): 59<br />

PPP coefficient: 1.29<br />