<strong>International</strong> building costs, in <strong>2016</strong><br />

UGX<br />

USD<br />

(exchange<br />

rate: 3,395)<br />

Retail<br />

Large shopping centre including mall 4,173,600 1,230<br />

Neighbourhood incl super<strong>market</strong> 2,793,900 820<br />

Prestige car showroom 2,759,400 810<br />

Composite trade rates<br />

Excavate basement (m 3 ) (1800m 3 job) 13,800 4<br />

Excavate footings (m) 10,300 3<br />

Concrete in slab (m 3 ) (1500m 3 job) 672,600 198<br />

Reinforcement in beams (tonne) 4,074,000 1,200<br />

Formwork to soffit of slab (m 2 ) 44,800 13<br />

Blockwork in wall (m 2 ) (10,000 block job) 103,500 30<br />

Structural steel beams (tonne) 10,185,000 3,000<br />

Pre-cast concrete wall (m 2 ) 427,700 126<br />

Curtain wall glazing incl support system (m 2 ) (1000m 2 job) 965,800 284<br />

Plasterboard 13mm thick to stud wall (m 2 ) (3000m 2 job) 124,200 37<br />

Single solid core door incl frame and hardware (no) (50 door job) 1,390,000 409<br />

Painting to walls primer + 2 coats (m 2 ) 13,800 4<br />

Ceramic tiling (m 2 ) (1000m 2 job) 103,500 30<br />

Vinyl flooring to wet areas (m 2 ) (500m 2 job) 341,500 101<br />

Carpet medium tufted (m 2 ) (4500m 2 job) 172,500 51<br />

Lighting installation (m 2 ) (5000m 2 + job) 417,400 123<br />

Copper pipe 15mm to wall (m) (1000+ metre job) 93,100 27<br />

Fire sprinklers (per m 2 ) (5000m 2 job) 204,000 60<br />

Air conditioning incl main plant (m 2 ) (5000m 2 + job) 344,900 102<br />

Labour costs<br />

Group 1 Tradesman e.g. plumber, electrician 9,500 3<br />

Group 2 Tradesman e.g. carpenter, bricklayer 3,200 1<br />

Group 3 Tradesman e.g. carpet layer, tiler, plasterer 6,500 2<br />

General labourer 3,000 1<br />

Site foreman 9,500 3<br />

Material costs<br />

Concrete 30 MPa (m 3 ) (1500m 3 job) 650,000 191<br />

Reinforcement bar 16mm (tonne) (120 tonne job) 3,656,200 1,077<br />

Concrete block (400x200) per 1000 (>10,000 block job) 4,387,400 1,292<br />

Standard brick per 1000 576,000 170<br />

Structural steel beams (tonne) (100 tonne+ job) 9,206,000 2,712<br />

Glass pane 10mm tempered (m 2 ) 365,600 108<br />

Softwood timber for framing 100mm x 50mm (m) 10,300 3<br />

13mm plasterboard (m 2 ) 10,300 3<br />

Emulsion paint (litre) 11,900 4<br />

Copper pipe 15mm (metre) (1000+ metre job) 69,000 20<br />

Copper cable (metre) (3C + E, 2.5mm PVC) (100,000m+ job) 37,900 11.2<br />

Plant<br />

Hire 50t mobile crane + operator (day) 4,725,500 1,392<br />

Market:<br />

lukewarm<br />

Tendering:<br />

warmer<br />

Cost escalation 2015–16: 9.5%<br />

Cost escalation <strong>2016</strong>–17: 9.8%<br />

Contractor’s margin: 6.0%<br />

Preliminaries: 9.0%<br />

Location factor (USD): 43<br />

PPP coefficient: 2,273.96<br />

<strong>International</strong> <strong>construction</strong> <strong>market</strong> <strong>survey</strong> <strong>2016</strong> 71