<strong>International</strong> building costs, in <strong>2016</strong><br />
UGX<br />
USD<br />
(exchange<br />
rate: 3,395)<br />
Retail<br />
Large shopping centre including mall 4,173,600 1,230<br />
Neighbourhood incl super<strong>market</strong> 2,793,900 820<br />
Prestige car showroom 2,759,400 810<br />
Composite trade rates<br />
Excavate basement (m 3 ) (1800m 3 job) 13,800 4<br />
Excavate footings (m) 10,300 3<br />
Concrete in slab (m 3 ) (1500m 3 job) 672,600 198<br />
Reinforcement in beams (tonne) 4,074,000 1,200<br />
Formwork to soffit of slab (m 2 ) 44,800 13<br />
Blockwork in wall (m 2 ) (10,000 block job) 103,500 30<br />
Structural steel beams (tonne) 10,185,000 3,000<br />
Pre-cast concrete wall (m 2 ) 427,700 126<br />
Curtain wall glazing incl support system (m 2 ) (1000m 2 job) 965,800 284<br />
Plasterboard 13mm thick to stud wall (m 2 ) (3000m 2 job) 124,200 37<br />
Single solid core door incl frame and hardware (no) (50 door job) 1,390,000 409<br />
Painting to walls primer + 2 coats (m 2 ) 13,800 4<br />
Ceramic tiling (m 2 ) (1000m 2 job) 103,500 30<br />
Vinyl flooring to wet areas (m 2 ) (500m 2 job) 341,500 101<br />
Carpet medium tufted (m 2 ) (4500m 2 job) 172,500 51<br />
Lighting installation (m 2 ) (5000m 2 + job) 417,400 123<br />
Copper pipe 15mm to wall (m) (1000+ metre job) 93,100 27<br />
Fire sprinklers (per m 2 ) (5000m 2 job) 204,000 60<br />
Air conditioning incl main plant (m 2 ) (5000m 2 + job) 344,900 102<br />
Labour costs<br />
Group 1 Tradesman e.g. plumber, electrician 9,500 3<br />
Group 2 Tradesman e.g. carpenter, bricklayer 3,200 1<br />
Group 3 Tradesman e.g. carpet layer, tiler, plasterer 6,500 2<br />
General labourer 3,000 1<br />
Site foreman 9,500 3<br />
Material costs<br />
Concrete 30 MPa (m 3 ) (1500m 3 job) 650,000 191<br />
Reinforcement bar 16mm (tonne) (120 tonne job) 3,656,200 1,077<br />
Concrete block (400x200) per 1000 (>10,000 block job) 4,387,400 1,292<br />
Standard brick per 1000 576,000 170<br />
Structural steel beams (tonne) (100 tonne+ job) 9,206,000 2,712<br />
Glass pane 10mm tempered (m 2 ) 365,600 108<br />
Softwood timber for framing 100mm x 50mm (m) 10,300 3<br />
13mm plasterboard (m 2 ) 10,300 3<br />
Emulsion paint (litre) 11,900 4<br />
Copper pipe 15mm (metre) (1000+ metre job) 69,000 20<br />
Copper cable (metre) (3C + E, 2.5mm PVC) (100,000m+ job) 37,900 11.2<br />
Plant<br />
Hire 50t mobile crane + operator (day) 4,725,500 1,392<br />
Market:<br />
lukewarm<br />
Tendering:<br />
warmer<br />
Cost escalation 2015–16: 9.5%<br />
Cost escalation <strong>2016</strong>–17: 9.8%<br />
Contractor’s margin: 6.0%<br />
Preliminaries: 9.0%<br />
Location factor (USD): 43<br />
PPP coefficient: 2,273.96<br />