<strong>International</strong> building costs, in <strong>2016</strong><br />

QAR<br />

USD<br />

(exchange<br />

rate: 3.64)<br />

Retail<br />

Large shopping centre including mall 6,695 1,840<br />

Neighbourhood incl super<strong>market</strong> 5,800 1,590<br />

Prestige car showroom 9,325 2,560<br />

Composite trade rates<br />

Excavate basement (m 3 ) (1800m 3 job) 42 12<br />

Excavate footings (m) 47 13<br />

Concrete in slab (m 3 ) (1500m 3 job) 625 172<br />

Reinforcement in beams (tonne) 4,725 1,298<br />

Formwork to soffit of slab (m 2 ) 135 37<br />

Blockwork in wall (m 2 ) (10,000 block job) 120 33<br />

Structural steel beams (tonne) 14,600 4,011<br />

Pre-cast concrete wall (m 2 ) 670 184<br />

Curtain wall glazing incl support system (m 2 ) (1000m 2 job) 1,980 544<br />

Plasterboard 13mm thick to stud wall (m 2 ) (3000m 2 job) 188 52<br />

Single solid core door incl frame and hardware (no) (50 door job) 4,280 1,176<br />

Painting to walls primer + 2 coats (m 2 ) 27 7<br />

Ceramic tiling (m 2 ) (1000m 2 job) 202 55<br />

Vinyl flooring to wet areas (m 2 ) (500m 2 job) 156 43<br />

Carpet medium tufted (m 2 ) (4500m 2 job) 235 65<br />

Lighting installation (m 2 ) (5000m 2 + job) 365 100<br />

Copper pipe 15mm to wall (m) (1000+ metre job) 67 18<br />

Fire sprinklers (per m 2 ) (5000m 2 job) 118 32<br />

Air conditioning incl main plant (m 2 ) (5000m 2 + job) 835 229<br />

Labour costs<br />

Group 1 Tradesman e.g. plumber, electrician 48 13<br />

Group 2 Tradesman e.g. carpenter, bricklayer 43 12<br />

Group 3 Tradesman e.g. carpet layer, tiler, plasterer 27 7<br />

General labourer 14 4<br />

Site foreman 51 14<br />

Material costs<br />

Concrete 30 MPa (m 3 ) (1500m 3 job) 302 83<br />

Reinforcement bar 16mm (tonne) (120 tonne job) 3,355 922<br />

Concrete block (400x200) per 1000 (>10,000 block job) 4,235 1,163<br />

Standard brick per 1000 3,065 842<br />

Structural steel beams (tonne) (100 tonne+ job) 6,975 1,916<br />

Glass pane 10mm tempered (m 2 ) 750 206<br />

Softwood timber for framing 100mm x 50mm (m) 19 5<br />

13mm plasterboard (m 2 ) 13 4<br />

Emulsion paint (litre) 78 21<br />

Copper pipe 15mm (metre) (1000+ metre job) 16 4<br />

Copper cable (metre) (3C + E, 2.5mm PVC) (100,000m+ job) 3 1<br />

Plant<br />

Hire 50t mobile crane + operator (day) 3,400 934<br />

Market:<br />

lukewarm<br />

Tendering:<br />

staying the same<br />

Cost escalation 2015–16: 2.7%<br />

Cost escalation <strong>2016</strong>–17: 1.5%<br />

Contractor’s margin: 12.0%<br />

Preliminaries: 14.0%<br />

Location factor (USD): 57<br />

PPP coefficient: 2.82<br />