15.08.2017 Views

Digital Urban Simulation : Documentation of the Teaching Results from the Autumn Semester 2015

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Current Situation: Axial Map - Integration<br />

Current Situation:<br />

Axial Map - Integration<br />

The map <strong>of</strong> <strong>the</strong> current situation shows that <strong>the</strong> most integrated axes are between <strong>the</strong><br />

Central and <strong>the</strong> Bahnh<strong>of</strong>platz and run along <strong>the</strong> Bahnh<strong>of</strong>quai. However, none <strong>of</strong> <strong>the</strong>se<br />

paths<br />

The map<br />

allow<br />

<strong>of</strong><br />

<strong>the</strong><br />

<strong>the</strong><br />

people<br />

current<br />

to<br />

situation<br />

get to<br />

shows<br />

<strong>the</strong> Limmat.<br />

that <strong>the</strong><br />

The<br />

most<br />

paths<br />

integrated<br />

are purely<br />

axes<br />

functional,<br />

are between<br />

evading<br />

<strong>the</strong> Central and <strong>the</strong><br />

obstacles,<br />

to <strong>the</strong> Limmat.<br />

in this<br />

The<br />

case<br />

paths<br />

<strong>the</strong> underpass.<br />

are purely functional,<br />

Standing in<br />

evading<br />

this area,<br />

obstacles,<br />

this is also<br />

in this<br />

<strong>the</strong> case.<br />

case <strong>the</strong><br />

People<br />

underpass. Standin<br />

walk<br />

integrated<br />

between<br />

axes,<br />

Central<br />

never<br />

and<br />

really<br />

<strong>the</strong><br />

approaching<br />

Hauptbahnh<strong>of</strong><br />

<strong>the</strong> River.<br />

along <strong>the</strong> most integrated axes, never<br />

really<br />

The new<br />

approaching<br />

proposal<br />

<strong>the</strong><br />

shows<br />

River.<br />

a much closer relationship to <strong>the</strong> Limmat. People will be able to move along<br />

axis between Central and <strong>the</strong> Bahnh<strong>of</strong>splatz. Presumably people will continue using <strong>the</strong> old paths whe<br />

<strong>the</strong> Limmat back to <strong>the</strong> city and are well integrated into <strong>the</strong> pedestrian network.<br />

New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Limmat Loop<br />

32<br />

New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />

Chair <strong>of</strong><br />

Information<br />

iA Architecture

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!