Integration - Difference between Status Quo & Lake Tunnel (Figure 6)<br />
Integration - Difference between Status Quo & Lake Tunnel (Figure 6)<br />
Integration <strong>Simulation</strong> - Status Quo vs. Lake Tunnel<br />
Integration <strong>Simulation</strong> - Status Quo vs. Lake Tunnel<br />
The two scenarios, Status Quo and Lake Tunnel, were analyzed with depthmap to see <strong>the</strong> difference in integration<br />
and to visualize <strong>the</strong> effect <strong>of</strong> closing <strong>the</strong> highway ring. The analysis radius <strong>of</strong> <strong>the</strong> integration analysis was set<br />
The<br />
to infinity<br />
two scenarios,<br />
to get a picture<br />
Status<br />
about<br />
Quo<br />
<strong>the</strong><br />
and<br />
city<br />
Lake<br />
wide<br />
Tunnel,<br />
hot spots.<br />
were<br />
The<br />
analyzed<br />
scales <strong>of</strong> <strong>the</strong><br />
with<br />
two<br />
depthmap<br />
analysis results<br />
to see<br />
were<br />
<strong>the</strong><br />
aligned<br />
difference<br />
to get<br />
in<br />
integra- comparabe tion results. and to visualize <strong>the</strong> effect <strong>of</strong> closing <strong>the</strong> highway ring. The analysis radius <strong>of</strong> <strong>the</strong> integration<br />
analysis was set to infinity to get a picture about <strong>the</strong> city wide hot spots. The scales <strong>of</strong> <strong>the</strong> two analysis<br />
results Since it is were not easy aligned to see to <strong>the</strong> get difference comparabe between results. figure 4 and 5, <strong>the</strong> integration results <strong>of</strong> <strong>the</strong> Status Quo scenario<br />
were substracted <strong>from</strong> <strong>the</strong> results <strong>of</strong> <strong>the</strong> Lake Tunnel values. Figure 6 was drawn with processing and is showing<br />
<strong>the</strong>se it is differences. not easy In to figure see <strong>the</strong> 6, <strong>the</strong> difference roads whose between integration figure value 4 and changed 5, <strong>the</strong> is integration clearly visible. results <strong>of</strong> <strong>the</strong> Status<br />
Since<br />
Quo scenar- io were substracted <strong>from</strong> <strong>the</strong> results <strong>of</strong> <strong>the</strong> Lake Tunnel values. Figure 6 was drawn with<br />
processing Integration is and a value is show- for <strong>the</strong> ing centrality <strong>the</strong>se <strong>of</strong> differences. each segment In figure and is 6, calculated <strong>the</strong> roads by how whose far a integration segment is value in relation changed to all<br />
is <strong>the</strong> clearly o<strong>the</strong>r segments. visible. Since in <strong>the</strong> Lake Tunnel scenario roads were just added and none were deleted, <strong>the</strong> integration<br />
<strong>of</strong> all <strong>the</strong> segments gets ei<strong>the</strong>r higher or stays more or less <strong>the</strong> same. As seen in figure 6, <strong>the</strong> integration<br />
Integration<br />
around <strong>the</strong> highway<br />
is a value<br />
ring<br />
for<br />
is increased<br />
<strong>the</strong> centrality<br />
much<br />
<strong>of</strong><br />
more<br />
each<br />
<strong>the</strong>n<br />
segment<br />
in <strong>the</strong> centre<br />
and is<br />
<strong>of</strong><br />
calculated<br />
<strong>the</strong> city. Especially<br />
by how<br />
around<br />
far a<br />
<strong>the</strong><br />
segment<br />
new highway<br />
junctions <strong>the</strong> integration in <strong>the</strong> Lake Tunnel scenario is much higher than it’s value in <strong>the</strong> Status Quo scenar-<br />
is in<br />
relation to all <strong>the</strong> o<strong>the</strong>r segments. Since in <strong>the</strong> Lake Tunnel scenario roads were just added and none<br />
io.<br />
were deleted, <strong>the</strong> integra- tion <strong>of</strong> all <strong>the</strong> segments gets ei<strong>the</strong>r higher or stays more or less <strong>the</strong> same.<br />
As seen in figure 6, <strong>the</strong> integration around <strong>the</strong> highway ring is increased much more <strong>the</strong>n in <strong>the</strong> centre<br />
City-Wide, as seen in figure 4 & 5, <strong>the</strong> integration pattern stays more or less <strong>the</strong> same since <strong>the</strong> overall hot spots<br />
<strong>of</strong> are <strong>the</strong> still city. almost Especially at <strong>the</strong> same around place. <strong>the</strong> new high- way junctions <strong>the</strong> integration in <strong>the</strong> Lake Tunnel scenario is<br />
much higher than it’s value in <strong>the</strong> Status Quo scenario.<br />
City-Wide, as seen in figure 4 & 5, <strong>the</strong> integration pattern stays more or less <strong>the</strong> same since <strong>the</strong> overall<br />
hot spots are still almost at <strong>the</strong> same place.<br />
3/13<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
61