15.08.2017 Views

Digital Urban Simulation : Documentation of the Teaching Results from the Autumn Semester 2015

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Integration - Difference between Status Quo & Lake Tunnel (Figure 6)<br />

Integration - Difference between Status Quo & Lake Tunnel (Figure 6)<br />

Integration <strong>Simulation</strong> - Status Quo vs. Lake Tunnel<br />

Integration <strong>Simulation</strong> - Status Quo vs. Lake Tunnel<br />

The two scenarios, Status Quo and Lake Tunnel, were analyzed with depthmap to see <strong>the</strong> difference in integration<br />

and to visualize <strong>the</strong> effect <strong>of</strong> closing <strong>the</strong> highway ring. The analysis radius <strong>of</strong> <strong>the</strong> integration analysis was set<br />

The<br />

to infinity<br />

two scenarios,<br />

to get a picture<br />

Status<br />

about<br />

Quo<br />

<strong>the</strong><br />

and<br />

city<br />

Lake<br />

wide<br />

Tunnel,<br />

hot spots.<br />

were<br />

The<br />

analyzed<br />

scales <strong>of</strong> <strong>the</strong><br />

with<br />

two<br />

depthmap<br />

analysis results<br />

to see<br />

were<br />

<strong>the</strong><br />

aligned<br />

difference<br />

to get<br />

in<br />

integra- comparabe tion results. and to visualize <strong>the</strong> effect <strong>of</strong> closing <strong>the</strong> highway ring. The analysis radius <strong>of</strong> <strong>the</strong> integration<br />

analysis was set to infinity to get a picture about <strong>the</strong> city wide hot spots. The scales <strong>of</strong> <strong>the</strong> two analysis<br />

results Since it is were not easy aligned to see to <strong>the</strong> get difference comparabe between results. figure 4 and 5, <strong>the</strong> integration results <strong>of</strong> <strong>the</strong> Status Quo scenario<br />

were substracted <strong>from</strong> <strong>the</strong> results <strong>of</strong> <strong>the</strong> Lake Tunnel values. Figure 6 was drawn with processing and is showing<br />

<strong>the</strong>se it is differences. not easy In to figure see <strong>the</strong> 6, <strong>the</strong> difference roads whose between integration figure value 4 and changed 5, <strong>the</strong> is integration clearly visible. results <strong>of</strong> <strong>the</strong> Status<br />

Since<br />

Quo scenar- io were substracted <strong>from</strong> <strong>the</strong> results <strong>of</strong> <strong>the</strong> Lake Tunnel values. Figure 6 was drawn with<br />

processing Integration is and a value is show- for <strong>the</strong> ing centrality <strong>the</strong>se <strong>of</strong> differences. each segment In figure and is 6, calculated <strong>the</strong> roads by how whose far a integration segment is value in relation changed to all<br />

is <strong>the</strong> clearly o<strong>the</strong>r segments. visible. Since in <strong>the</strong> Lake Tunnel scenario roads were just added and none were deleted, <strong>the</strong> integration<br />

<strong>of</strong> all <strong>the</strong> segments gets ei<strong>the</strong>r higher or stays more or less <strong>the</strong> same. As seen in figure 6, <strong>the</strong> integration<br />

Integration<br />

around <strong>the</strong> highway<br />

is a value<br />

ring<br />

for<br />

is increased<br />

<strong>the</strong> centrality<br />

much<br />

<strong>of</strong><br />

more<br />

each<br />

<strong>the</strong>n<br />

segment<br />

in <strong>the</strong> centre<br />

and is<br />

<strong>of</strong><br />

calculated<br />

<strong>the</strong> city. Especially<br />

by how<br />

around<br />

far a<br />

<strong>the</strong><br />

segment<br />

new highway<br />

junctions <strong>the</strong> integration in <strong>the</strong> Lake Tunnel scenario is much higher than it’s value in <strong>the</strong> Status Quo scenar-<br />

is in<br />

relation to all <strong>the</strong> o<strong>the</strong>r segments. Since in <strong>the</strong> Lake Tunnel scenario roads were just added and none<br />

io.<br />

were deleted, <strong>the</strong> integra- tion <strong>of</strong> all <strong>the</strong> segments gets ei<strong>the</strong>r higher or stays more or less <strong>the</strong> same.<br />

As seen in figure 6, <strong>the</strong> integration around <strong>the</strong> highway ring is increased much more <strong>the</strong>n in <strong>the</strong> centre<br />

City-Wide, as seen in figure 4 & 5, <strong>the</strong> integration pattern stays more or less <strong>the</strong> same since <strong>the</strong> overall hot spots<br />

<strong>of</strong> are <strong>the</strong> still city. almost Especially at <strong>the</strong> same around place. <strong>the</strong> new high- way junctions <strong>the</strong> integration in <strong>the</strong> Lake Tunnel scenario is<br />

much higher than it’s value in <strong>the</strong> Status Quo scenario.<br />

City-Wide, as seen in figure 4 & 5, <strong>the</strong> integration pattern stays more or less <strong>the</strong> same since <strong>the</strong> overall<br />

hot spots are still almost at <strong>the</strong> same place.<br />

3/13<br />

New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />

61

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!