15.08.2017 Views

Digital Urban Simulation : Documentation of the Teaching Results from the Autumn Semester 2015

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Choice Hochschulgebiet Zentrum - Status Quo (left) & Lake Tunnel (right) (Figure 10 & 11)<br />

Choice Hochschulgebiet Zentrum - Status Quo (left) & Lake Tunnel (right) (Figure 10 & 11)<br />

An<br />

An<br />

Th<br />

bu Th<br />

stu bu<br />

int stu<br />

int<br />

A s<br />

run A s<br />

stu run<br />

stu<br />

All<br />

<strong>the</strong> All<br />

ab <strong>the</strong><br />

ab<br />

Choice Hochschulgebiet Zentrum - Status Quo (left) & Lake Tunnel (right) (Figure 10 & 11)<br />

The main focus <strong>of</strong> this project lies on an<br />

optimization The main focus <strong>of</strong> <strong>of</strong> <strong>the</strong> this area project <strong>of</strong> <strong>the</strong> lies “Hochschulgebiet<br />

optimization main Zentrum”. <strong>of</strong> focus <strong>the</strong> area In <strong>of</strong> <strong>of</strong> this this <strong>the</strong> section “Hoch-<br />

project <strong>the</strong> lies<br />

on an<br />

The<br />

on impact schulgebiet an <strong>of</strong> optimization <strong>the</strong> Zentrum”. a Lake Tunnel In <strong>of</strong> this <strong>the</strong> (closing section area <strong>of</strong> <strong>the</strong> <strong>the</strong> <strong>of</strong> <strong>the</strong><br />

“Hochschulgebiet highway impact <strong>of</strong> ring) <strong>the</strong> a on Lake <strong>the</strong> Zentrum”. Tunnel choice (closing <strong>of</strong> <strong>the</strong> In this roads <strong>of</strong> section <strong>the</strong><br />

<strong>the</strong> within highway impact <strong>the</strong> ring) area <strong>of</strong> on <strong>the</strong> <strong>of</strong> <strong>the</strong> interest a choice Lake is Tunnel evaluated. <strong>of</strong> <strong>the</strong> roads (closing <strong>of</strong><br />

<strong>the</strong> within highway <strong>the</strong> area ring) <strong>of</strong> interest on <strong>the</strong> choice is evaluated. <strong>of</strong> <strong>the</strong> roads<br />

within Figure 10 <strong>the</strong> & area 11 show <strong>of</strong> interest <strong>the</strong> absolute is evaluated. choice<br />

value. Figure It 10 can & 11 be show seen <strong>the</strong> that absolute <strong>the</strong> main choice roads<br />

Figure<br />

(Rämistrasse, value. It 10 can & be Universitätsstrasse<br />

11 seen show that <strong>the</strong> absolute main & Seilergraben)<br />

show a lower value in <strong>the</strong> scenario<br />

roads choice<br />

value. (Rämistrasse, It can Universitätsstrasse be seen that <strong>the</strong> & main Seiler-roadgraben)<br />

<strong>the</strong> show Lake Tunnel a lower than value in in <strong>the</strong> <strong>the</strong> status<br />

with<br />

(Rämistrasse, Universitätsstrasse scenario &<br />

quo with scenario. <strong>the</strong> Lake Figure Tunnel 12 than shows in <strong>the</strong> again status <strong>the</strong><br />

Seilergraben) show a lower value in <strong>the</strong><br />

difference quo scenario. <strong>of</strong> <strong>the</strong> Figure choice 12 shows value <strong>of</strong> again <strong>the</strong> Lake<br />

scenario<br />

<strong>the</strong><br />

Tunnel difference Scenario<br />

with <strong>the</strong><br />

<strong>of</strong> <strong>the</strong> and<br />

Lake<br />

choice <strong>the</strong> value status<br />

Tunnel<br />

<strong>of</strong> quo<br />

than in <strong>the</strong><br />

<strong>the</strong> Lake<br />

status scenario quo<br />

Tunnel Scenario (lake scenario. tunel and minus Figure<br />

<strong>the</strong> status status 12<br />

quo quo). shows A again<br />

<strong>the</strong> positive difference<br />

scenario value (lake tunel means <strong>of</strong> <strong>the</strong><br />

minus that choice <strong>the</strong> status choice value<br />

quo). in A <strong>the</strong> <strong>of</strong> <strong>the</strong><br />

Lake lake positive tunel Tunnel<br />

value scenario Scenario<br />

means is higher and<br />

that <strong>the</strong> than <strong>the</strong><br />

choice in status <strong>the</strong> quo<br />

in <strong>the</strong><br />

scenario status lake tunel quo (lake<br />

scenario tunnel<br />

is and higher<br />

minus vice than versa. status<br />

in <strong>the</strong><br />

quo). A<br />

positive status quo value scenario means and that vice <strong>the</strong> versa. choice in <strong>the</strong><br />

lake tunnel scenario is higher than in <strong>the</strong><br />

status quo scenario and vice versa.<br />

Choice Difference - Hochschulgebiet Zentrum (Figure 12)<br />

Choice Difference - Hochschulgebiet Zentrum (Figure 12)<br />

Out<br />

Out<br />

<strong>of</strong><br />

<strong>of</strong><br />

<strong>the</strong><br />

<strong>the</strong><br />

segment<br />

segment<br />

analysis<br />

analysis<br />

it is<br />

it<br />

visible<br />

is visible<br />

that<br />

that<br />

a lake tunnel which closes <strong>the</strong> highway ring could be a good strategy<br />

Out to <strong>of</strong> reduce <strong>the</strong> segment traffic in analysis <strong>the</strong> city it center is visible <strong>of</strong> Zurich that a lake and tunnel especially which in <strong>the</strong> closes “Hochschulgebiet <strong>the</strong> highway ring Zentrum”.<br />

a lake tunnel which closes <strong>the</strong> highway ring<br />

could be a good strategy<br />

could to reduce be a traffic good in strategy <strong>the</strong> city to center reduce <strong>of</strong> Zurich traffic and especially in <strong>the</strong> “Hochschulgebiet Zentrum”.<br />

in <strong>the</strong> city centre <strong>of</strong> Zurich and especially in<br />

<strong>the</strong> <strong>Digital</strong> “Hochschulgebiet <strong>Urban</strong> <strong>Simulation</strong> | Zentrum”.<br />

Name <strong>of</strong> <strong>the</strong> project<br />

<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Name <strong>of</strong> <strong>the</strong> project<br />

Choice Difference - Hochschulgebiet Zentrum (Figure 12)<br />

Fig<br />

Fig<br />

Fo<br />

1 FoP<br />

1 P<br />

64<br />

New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />

Chair <strong>of</strong><br />

Information<br />

iA Architecture

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!