Views
2 weeks ago

CAPITOL TECHNICAL GUIDE v3

OUTSIDE MOUNT HEIGHT

OUTSIDE MOUNT HEIGHT INSIDE MOUNT 135º BAY WINDOW 1. Measure inside each section at the front edge of the reveal as shown above. 2. A+B+C = total window width. This is the width you enter on the order as window size 3. The total width of A is the location of bay post 1 4. The total width of A + B is the location of bay post 2 5. If a divider rail is required, measure from the inside bottom to the centre of the required divider rail location. Remember rails could vary up to 40mm if not specified critical. 6. If a T post is required, measure from the inside left to the centre of the T post location T post location in area B would be A + Post position 7. For multiple T posts, measure from inside left to the centre of each following post location A + post 2 position etc 36

OUTSIDE MOUNT 135º BAY WINDOW 1. Measure outside each section from the architrave to the back of where frame would sit as shown above. 2. A+B+C = total window width. This is the width you enter on the order as finish size 3. The total width of A is the location of bay post 1 4. The total width of A + B is the location of bay post 2 5. If a divider rail is required, measure from the floor or outside of architrave to the centre of the required divider rail location. Remember rails could vary up to 40mm if not specified critical. 6. If a T post is required, measure from the outside of architrave at left to the centre of the T post location. T post location in area B would be A + Post position 7. For multiple T posts, measure from outside of architrave at left to the centre of each following post location. A + post 2 position etc INSIDE MOUNT 90º CORNER WINDOW 1. Measure inside each section at the front edge of the reveal as shown left. 2. A+B = total window width. 3. This is the size you enter on the order as window size 4. The total width of A is the location of corner post 5. If a divider rail is required, measure from the inside bottom to the centre of the required divider rail location. Remember rails could vary up to 40mm if not specified critical. 6. If a T post is required, measure from the inside left to the centre of the T post location 7. T post location in area B would be A + Post position 37

2015-additional-needs-guide-v3
policy-guide-201201-Category-Guide-V3
M7CL V3 Quick Start Guide Part 1
14295 Concierge Amenities Guide V3.indd - Mirage
TECHNICAL GUIDE
TECHNICAL GUIDE
WorkEngine v3.x Installation Guide - EPM Live
TECHNICAL GUIDE
CAPITOL IDEAS
HL7 V3 TECHNICAL EDITING: RIM INTRODUCTION - HL7 Wiki
TECHNICAL GUIDE
TECHNICAL GUIDE