Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
FRAMED SHUTTER INSTALLATION cont.<br />
4. Secure frame mitres permanently in place using the screws supplied in pre-drill holes.<br />
5. If you have T posts they will be pre-drilled and stamped at the bottom in order from left<br />
to right. Locate the correct position and assemble in place.<br />
6. Position panels in the frame by following the number stamped at the top and insert the<br />
hinge pins.<br />
7. Make sure the gaps are even between panels and posts and screw T posts in place if<br />
required. Make any adjustments to square the frame up.<br />
8. Remove hinge pins and panels.<br />
9. Position the frame in the window and pre-drill fixing holes in you desired place. Tack the<br />
frame into place temporarily using fixing screws without driving all the way.<br />
10. Working left to right, position panels into place and insert hinged pins.<br />
11. Check for squareness and make adjustments for gaps and ensure panels line up.<br />
12. If frame needs to be adjusted up or down, or side to side, slacken off tacking screws and<br />
insert a packer at the required location and screw in the frame at the new position.<br />
13. Continue steps 10 and 11 until panels line up and gaps are even.<br />
14. Drive fixing screws in all the way.<br />
15. Screws should be positioned where hinges are located and near magnet striker plates.<br />
16. Check for squareness and ensure panels operate correctly.<br />
17. If using L frame inside mount, gap fill where the frame meets the window reveal.<br />
18. Fix screw cap stickers to cover fixing screws.<br />
19. Open and close each panel and rotate all tilts to check the shutters function correctly.<br />
20. Adjust tension screws if necessary to ensure all louvres rotate freely.<br />
21. Wipe shutters over and remove any surface marks using gumption for OPUS, car polish<br />
for ENCORE, or a spot clean tool such as Chux Magic Eraser.<br />
22. Clean up workspace and remove all packaging materials from site.<br />
52