13.11.2019 Views

code_of_practice_V3_2019

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2.6 CARRIAGE OF ADDITIONAL EQUIPMENT<br />

2.6.1 Equipment on board, which is expected to be relied on in situations affecting safety or pollution prevention, must<br />

be in an operational condition. If such equipment is inoperative and is in excess <strong>of</strong> the equipment required by this<br />

Code it should either be repaired, removed or if removal is not practical, clearly marked as inoperative and<br />

secured. The status <strong>of</strong> the (inoperable) equipment should also be reported at the relevant RCC and/or within the<br />

control system <strong>of</strong> the vessel. Reference should also be made to MGN79 on Safety Equipment and Pollution<br />

Prevention Equipment carried in excess <strong>of</strong> Statutory Requirements..<br />

AutoNaut USV<br />

24 MASS UK Industry Conduct Principles and Code <strong>of</strong> Practice Version 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!