giving weight to the sub criteria, defining the scoring system used <strong>for</strong> the criteria and sub<br />

criteria, and visiting site <strong>of</strong> supplier.<br />

The sixth stage is negotiations & making contracts. There are different pricing methods used in<br />

outsourcing contracts such as: Fixed price, unit pricing, cost-Plus pricing (based on the cost<br />

price), variable pricing, risk and reward sharing, and per<strong>for</strong>mance based pricing (based on the<br />

incentives). In this stage, the time and conditions <strong>of</strong> using each <strong>of</strong> these methods are important.<br />

The seventh stage is monitoring and controlling. Since the suppliers are outside the<br />

administrative and managerial circle <strong>of</strong> the organization, it is necessary to control and manage<br />

the relations with them using different appropriate methods and mechanisms in a way that the<br />

organization’s expectations are fulfilled in regard to the outsourced activity or service. For so<br />

doing, controlling five factors namely time, costs, quality, changes, and in<strong>for</strong>mation leak is <strong>of</strong><br />

great importance. There are different controlling methods used in outsourcing contracts such as;<br />

market-based controlling model, bureaucracy-based controlling model, and trust-based<br />

controlling model. For each type <strong>of</strong> mentioned models, should be determined which and how we<br />

can control each supplier about these factors; cost, quality, time, in<strong>for</strong>mation leak and changes.<br />

The last stage is reviewing and revising. This stage includes methods and criteria used <strong>for</strong><br />

gathering and analyzing the in<strong>for</strong>mation related to the measurement and grading <strong>of</strong> the<br />

supplier’s actual per<strong>for</strong>mance in a continuous time span. In this stage, the buyer organization<br />

must answer to two important following questions: what should be measured? And how <strong>of</strong>ten<br />

should measurements be carried out and reports be prepared?<br />

Research Design and Approach<br />

We measured “outsourcing score” by designed decision making model (AHP method) <strong>for</strong> 32<br />

activities (which have already been outsourced) in four Iranian automobile and automobile parts<br />

producer companies (in<strong>for</strong>mation about these companies is in. We designed and distributed<br />

questionnaires about outsourcing satisfaction (by Likret method) in these four companies.<br />

We implemented designed framework in IHDM (Iran heavy dies manufacturing) company in<br />

order to make dies and fixtures <strong>for</strong> TIBA automobile (TIBA is an Iranian automobile that<br />

designed and produced by SAIPA Company). This project consisted <strong>of</strong> 10 activities/processes<br />

which can outsource or make in house. We measured the rate <strong>of</strong> outsourcing satisfaction by<br />

designed questionnaire <strong>for</strong> this project. And we measured the rate <strong>of</strong> satisfaction <strong>for</strong> the<br />

previous project in IHDM (making dies and fixtures <strong>of</strong> SAIPA 132 automobile) too. We should<br />

remind both <strong>of</strong> these projects in IHDM had same activities. But there was difference about<br />

decision making to outsource/insource activities and how to implement outsourcing. Finally we<br />

measured the customer’s complaint and the rate <strong>of</strong> outsourcing satisfaction <strong>for</strong> suppliers<br />

companies in both project by another designed questionnaire.<br />

Results<br />

The relationship between outsourcing scores and the rate <strong>of</strong> outsourcing satisfaction:<br />

There was direct relationship between model’s scores and the percentage <strong>of</strong> outsourcing<br />

satisfaction. The relationship between outsourcing’s score and the percentage <strong>of</strong> outsourcing<br />

satisfaction will be determined through regression method (chart 1).The result <strong>of</strong> regression was<br />

below <strong>for</strong>ecasting <strong>for</strong>mula:<br />

The percentage <strong>of</strong> satisfaction with the outsourcing = the score in the model *1.085<br />

Tenth Annual International Daejeon, South Korea P a g e | 23<br />

Smart Sourcing Conference June 28-29, 2012