24.12.2012 Views

Annual Report 2008 - Office National des Hydrocarbures et des Mines

Annual Report 2008 - Office National des Hydrocarbures et des Mines

Annual Report 2008 - Office National des Hydrocarbures et des Mines

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PETROLEUM DRILLINGS & PRODUCTION<br />

24<br />

P<strong>et</strong>roleum drillings<br />

In <strong>2008</strong>, drilling works concentrated on the<br />

preparation of H.1700 N°II rig at the base<br />

of El Hanchane, in expectation of the works<br />

scheduled for the year 2009, especially the<br />

implementation of MKL-102 workover, Boujdour<br />

stratigraphic well, and Meskala development<br />

well.<br />

On the other hand, ONHYM ensured several<br />

services related to equipment location and<br />

support for the partners operating in Morocco.<br />

Hydrocarbon production<br />

The national production of hydrocarbons<br />

reached 49.60 million standard cubic m<strong>et</strong>ers<br />

ONHYM’s production<br />

ONHYM / partners’ production<br />

<strong>Office</strong> <strong>National</strong> <strong>des</strong> <strong>Hydrocarbures</strong> <strong>et</strong> <strong>des</strong> <strong>Mines</strong><br />

for natural gas and 8 850 tons for condensate<br />

and crude oil, thereby recording a fall of 18 %<br />

for natural gas and 19 % for condensate and<br />

crude compared to the previous year. This fall is<br />

mainly due to the reduction of OCP withdrawals,<br />

especially during the last quarter of <strong>2008</strong> and<br />

the stop of production in OLB-1 well depl<strong>et</strong>ed<br />

during the year.<br />

Production / wells Condensate/Crude in tons Natural gas in standard cubic m<strong>et</strong>ers<br />

Total 7 323 33 755 810<br />

• AHF-1 / Cabre - 1 699 494<br />

• SAR-1 / Cabre - 4 275 370<br />

• OLB-1 / Samir - 8 077 175<br />

• ONZ-4 / Circle Oil - 1 790 248<br />

Total - 15 842 287<br />

Samir’s production<br />

Sidi Rhalam (RH-2) 1 527 -<br />

Total 1 527 -<br />

Grand total 8 850 49 598 097

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!