24.12.2012 Views

Annual Report 2008 - Office National des Hydrocarbures et des Mines

Annual Report 2008 - Office National des Hydrocarbures et des Mines

Annual Report 2008 - Office National des Hydrocarbures et des Mines

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

South of Meknès (El Hajeb province), a feasibility<br />

study has been carried out by the Australian<br />

company Kasbah Resources. Since the start of<br />

drilling works on November 2007, 25 drillings<br />

totalling 7997 m divided into 3 phases were<br />

carried out until the end of September <strong>2008</strong>.<br />

The results obtained are encouraging and<br />

show several mineralized intersections : 13.6<br />

m with 0.5 % Sn (AD18), 12 m with 1.2 % Sn<br />

(AD19), 46.3 m with 0.8 % Sn (AD20), 36.5 m<br />

with 0.8 % Sn (AD21), 36.5 m with 0.8 % Sn,<br />

6.9 m with 1.85 % Sn (AD21), 25.0 m with<br />

1.29 % Sn (AD25).<br />

An updating of the resources model of the<br />

deposit according to Jorc Australian norm has<br />

been recently compl<strong>et</strong>ed and has permitted to<br />

define inferred resources of 6MT with 0.9 % Sn<br />

for cut grade of 0.6 % Sn. Mineralurgical tests<br />

are being carried out by SGS cabin<strong>et</strong>.<br />

Jebil<strong>et</strong> «ONHYM – CMG Agreement»<br />

(Polym<strong>et</strong>allic)<br />

In Jebil<strong>et</strong> prospect, located NW of Marrakech<br />

(Sidi Youssef Ben Ali province), works<br />

concentrated on mineralization prospecting of<br />

polym<strong>et</strong>allic sulfurous mass type at El Mna and<br />

32<br />

<strong>Office</strong> <strong>National</strong> <strong>des</strong> <strong>Hydrocarbures</strong> <strong>et</strong> <strong>des</strong> <strong>Mines</strong><br />

vein type at Bougader (Pb-Zn). These works<br />

include geological surveys, rock sampling and<br />

core drillings.<br />

At El Mna, the drilling that began in 2007 was<br />

carried on and reached interval 470.15 m.<br />

It first intersected felsic volcanic facies, then<br />

clay sediments. The units m<strong>et</strong> do not permit<br />

to explain the magn<strong>et</strong>ic anomaly observed in<br />

surface. A pulse – EM survey was carried out<br />

and did not d<strong>et</strong>ect any anomaly. The source of<br />

anomalies remains unexplained.<br />

At Bou Gader, the core drilling survey that began<br />

in 2007 in this prospect was followed by the<br />

execution of the 5 th core drilling (BGS5) that was<br />

stopped at interval 261 m after crossing a series<br />

of black pelites with pyrite and/or pyrrhotine<br />

dissemination. The project was stopped due to<br />

non encouraging results.<br />

Tekna «ONHYM – CMG Agreement»<br />

(Polym<strong>et</strong>allic)<br />

In Tekna district, located West and South West<br />

of Marrakech (Al Haouz province), the synthesis<br />

of former works permitted to select 3 magn<strong>et</strong>ic<br />

anomalies (Moulay Al Amine, Lamrah and<br />

Imarirne) on which an electric prospecting using<br />

MPP m<strong>et</strong>hod was carried out in partnership<br />

with Russian experts. The interpr<strong>et</strong>ation of<br />

anomalies obtained permitted to recommend 3<br />

reconnaissance core drillings totalling 1 800 m.<br />

Alous District «ONHYM - Odyssey Resources<br />

Ltd Agreement» (Cu, Ag)<br />

In Alous district, located in the Anti-Atlas,<br />

at about 120 km SE of Agadir (Taroudant<br />

province), the works focused on finalization<br />

of an orientation study that recommended an

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!