25.12.2012 Views

K Control panel

K Control panel

K Control panel

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.3 Skeleton diagram with optional regulator<br />

VA-SCS<br />

17<br />

1b<br />

1<br />

BPR-VA<br />

SI<br />

1a<br />

1a<br />

ZG<br />

4 3<br />

7 2<br />

1<br />

1<br />

1a<br />

L<br />

1<br />

BA<br />

DGAI 73<br />

SCS<br />

5 7<br />

1 2<br />

X13 5 4 X2 10 X3<br />

2<br />

1<br />

TAF<br />

1<br />

1<br />

3<br />

1<br />

6<br />

6<br />

5<br />

5<br />

2<br />

2 4<br />

FA<br />

2<br />

ECS<br />

8<br />

6<br />

RG<br />

CA<br />

7<br />

8<br />

CCE<br />

6<br />

CCE<br />

DJ4A TI<br />

1 2 1 3<br />

1<br />

1 TCH1<br />

CCE 2 PSG<br />

ECS<br />

3 1<br />

6<br />

7<br />

RG 3 2<br />

1<br />

9<br />

P<br />

9 7<br />

ZT<br />

1<br />

1<br />

1a 1b<br />

ZEH<br />

2<br />

1a 1b<br />

CA ECS CA<br />

CCE<br />

11<br />

12 4 1<br />

5<br />

CA<br />

CA<br />

6<br />

1<br />

4<br />

1<br />

9<br />

1<br />

TCH2<br />

2<br />

7<br />

4<br />

2<br />

2<br />

9<br />

8<br />

3<br />

2<br />

ZT<br />

2a 2b<br />

1a<br />

RG<br />

4 5<br />

TS 1<br />

3<br />

2<br />

BA 10<br />

3 8<br />

ZB<br />

1<br />

14<br />

CS<br />

2b<br />

17<br />

CA<br />

13<br />

15<br />

4 5 6<br />

(B)<br />

1 1 4<br />

VS VG VP<br />

1 2<br />

1<br />

11<br />

1<br />

7 1 6<br />

BA<br />

CO<br />

1a<br />

VB2 CH2<br />

14<br />

1<br />

BA<br />

4<br />

1<br />

CH1<br />

VB1<br />

1<br />

1<br />

h<br />

h<br />

VS<br />

2<br />

2<br />

5<br />

2<br />

1b<br />

5<br />

2<br />

2<br />

2<br />

A<br />

2<br />

P2<br />

2<br />

7 8 9<br />

15<br />

2a<br />

ZEH<br />

2<br />

7 BA BA 12<br />

1a<br />

VA-TS<br />

1b<br />

CCE**<br />

6 BA<br />

2 BA 13<br />

2 4<br />

TI<br />

BA<br />

5<br />

ZG<br />

2a 2<br />

N<br />

2<br />

BA<br />

8358N057<br />

ZB2 Burner switch<br />

ZEH Summer/Winter switch<br />

ZG Main switch<br />

ZT Test switch<br />

* Eco.NOx Version<br />

** S Version<br />

TCH2 Boiler thermostat<br />

2nd stage<br />

TI Isolating transformer<br />

TS Safety thermostat<br />

VA-TS Safety thermostat alarm<br />

indicator<br />

VB1 Stage 1 operating indicator<br />

VB2 Stage 2 operating indicator<br />

VP1 Stage 1 main valve<br />

VP2 Stage 2 main valve<br />

VS Safety indicator<br />

CS Safety contact<br />

Dj4A 4 A circuit-breaker<br />

ECS Domestic hot water<br />

P2 Shunt pump<br />

PSG Gas pressure switch<br />

RG Regulator<br />

SCS Safety control box<br />

SCS2 Ionisation measurement<br />

TAF Draught diverter thermostat<br />

TCH1 Boiler thermostat<br />

1st stage<br />

A Heating pump<br />

AE Electrical ignition device<br />

B Burner<br />

B2 Burner 2nd stage<br />

BPR-VA Reset button and<br />

burner alarm indicator<br />

CA Cascade<br />

CCE Leak proofing system<br />

CH1 Hour run meter 1st stage<br />

CH2 Hour run meter 2nd stage<br />

CO Flue damper

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!