25.12.2012 Views

K Control panel

K Control panel

K Control panel

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5.4 <strong>Control</strong> <strong>panel</strong> with cascade board<br />

The initial start-up shall be performed by<br />

a qualified professionnal.<br />

Before turning the boiler on, make sure that the<br />

installation is filled with water.<br />

Carry out the start-up operations in the order<br />

indicated below:<br />

● Set the boiler thermostats 5 to the maximum<br />

position.<br />

If required, move the maximum temperature stop as shown<br />

on page 17.<br />

● Set switch 1 to the AUTO position.<br />

● Make sure that safety thermostat 9 is ready. To do<br />

so, unscrew the hexagonal cap and press the reset<br />

button with a screwdriver.<br />

● Set the burner and heating pump switches 2 to the<br />

Winter position.<br />

● Set the main On/off switch 3 to the On position.<br />

30<br />

0<br />

l<br />

9 1<br />

22<br />

6A<br />

3 2 5<br />

8502N100

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!