K Control panel
K Control panel
K Control panel
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
5.4 <strong>Control</strong> <strong>panel</strong> with cascade board<br />
The initial start-up shall be performed by<br />
a qualified professionnal.<br />
Before turning the boiler on, make sure that the<br />
installation is filled with water.<br />
Carry out the start-up operations in the order<br />
indicated below:<br />
● Set the boiler thermostats 5 to the maximum<br />
position.<br />
If required, move the maximum temperature stop as shown<br />
on page 17.<br />
● Set switch 1 to the AUTO position.<br />
● Make sure that safety thermostat 9 is ready. To do<br />
so, unscrew the hexagonal cap and press the reset<br />
button with a screwdriver.<br />
● Set the burner and heating pump switches 2 to the<br />
Winter position.<br />
● Set the main On/off switch 3 to the On position.<br />
30<br />
0<br />
l<br />
9 1<br />
22<br />
6A<br />
3 2 5<br />
8502N100