25.12.2012 Views

K Control panel

K Control panel

K Control panel

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.2.2. Connections<br />

- Connect module connector B to connector C marked<br />

«MODULE ECS» (DHW MODULE) coming from the<br />

boiler control <strong>panel</strong>, after removing bridge plug D.<br />

- Connect the loading pump to the three-wire connecting<br />

block at the rear of the module, taking care to connect<br />

the phase (L), neutral (N) and earth ( ) wires correctly.<br />

- Connect the tank sensor to the two-wire connecting<br />

block marked «SB» at the rear of the module.<br />

Then:<br />

- Insert the probe E of the limiter thermostat in the boiler<br />

pocket.<br />

- Insert the tank sensor in the pocket of the domestic<br />

hot water tank.<br />

Note:<br />

If the tank is already fitted with a thermostat, it will not<br />

be used. Replace the tank thermostat bulb with the<br />

tank sensor.<br />

- Fasten the module onto the front of the control <strong>panel</strong><br />

with the help of the 2 Philips head screws of the<br />

module.<br />

- Proceed with the other connections.<br />

8<br />

DHW MODULE<br />

MODULE E.C.S<br />

BOILERVORRANGSCHALTUNG<br />

SB<br />

E<br />

SB<br />

C<br />

MB<br />

D<br />

T<br />

1<br />

2 3 4 5 6<br />

B<br />

MINI MAXI<br />

T=0<br />

7<br />

8<br />

TEMPO<br />

L N<br />

MB<br />

In the boiler<br />

pocket<br />

L N<br />

Tank sensor Load pump<br />

1<br />

2 3 4 5 6<br />

7<br />

8<br />

8502N091<br />

8801N112<br />

8502N092

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!