is the most financially viable way

to obtain a digital twin model of

the construction facility and the

equipment built into it.

What precisely all this means, I

will explain in answer to the next

question.

What Additional

Value Does The

Digital Twin Model

Give Me?

If we are talking about a BIM

project, the simplest explanation

for the difference between a BIM

as built model and a digital twin

model is that the BIM as built

model provides static information

about a built object, such as its

geometry, equipment capacity,

properties of used materials and

equipment, etc.

The digital twin of a building and

its built-in equipment enables the

cost anticipation of each element

during its life cycle. These costs

can be predicted on a monthly,

quarterly, yearly, or multi-year

basis, which can provide valuable

information to the investor or

user of the facility to optimize

and more effectively manage its

own finance.

How To Manage The

Project Process So

That The Investor

Will Eventually Get A

Cheap But Quality

Digital Twin Model?

Assuming we are talking about a

BIM project, the most straightforward

answer to the asked question

is that the investor, during

the preparation of all project

phases, has in his team an

experienced BIM manager

(employed by the investor or

hired as a BIM consultant), who

will manage the BIM requirements

in the interest of the

investor during all stages of the

BIM workflow. The starting

document, which should also

form part of the contract

between the designer and the

In contrast, the digital twin model

contains dynamic data such as

maintenance costs and the life

cycle of all elements of a building

and equipment installed, as well

as elements that simulate various

“real-world” impacts on them.

032 TeamCAD BIM

JAN 2021

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!