Let's take the example that the

investor, although this is usually

not the case, foresaw the same

designers of disciplines during all

phases of the project, from the

concept phase, all the way to the

construction stage project.

Furthermore, it usually happens

that, after the tender phase of

the project, BIM discipline models

are handed over to the

contractor, who extracts from

these BIM models the necessary

data related to construction

dynamics, bill of quantities,

quantities of materials needed

for construction, materials and

equipment that are going to be

installed in a building, etc.

If the investor, with the help of

his BIM Manager or BIM

Consultant engaged in the

project, did not monitor the

consistency of the BIM discipline

models during the previous

project phases and if it turns out

that BIM discipline models are

not usable for the contractor for

various reasons, justified or

unjustified, the investor can easily

face the problem that the

contractor requires him to

develop completely new BIM

discipline models for the

construction phase of the project,

which exposes the investor to

additional and unplanned costs.

An additional absurdity of this

situation is that the investor has

already paid the designers of the

disciplines designing and making

BIM models of disciplines, so the

investor, in case the BIM models

of disciplines generated by the

designer are not consistent with

the contractor's requirements,

would practically pay the same

thing twice.

So, in this very simple example,

you can see how important it is to

have consistency and continuity

of BIM disciplines models during

all phases of BIM project process,

regardless of whether BIM model

is in the hands of designer,

contractor, investor, company

engaged in facility maintenance

as a facility manager or the user

of the building.

In answer to the question - how

an investor can achieve

significant savings during all

phases of the BIM project

process, we can say - by

monitoring the consistency of the

BIM disciplines models from

conceptual BIM model to digital

twin model of the building and

equipment built into it with the

help of BIM Manager or BIM

Consultant on the project.

And how can BEP help us in the

consistency of the BIM modelling

process? You are going to get the

answer to this question in the

next few sentences…

Well Designed And

Implemented BIM

Modeling

Convention Brings

The Investor Big

Savings

It is this part of BEP - the BIM

modeling convention - that

ensures the consistency of the

BIM modeling process during all

phases of the BIM project

process. You can find much

more information about the

BIM modeling convention if you

read the article "BIM modelling

convention" where I covered

this topic in detail.

In this article, it is not my

intention to go into too much

detail on that topic. However, I

think it is important to note that

this part of the BEP largely

regulates the manner and

consistency of data and

064 TeamCAD BIM

JAN 2021