03.03.2023 Views

TeamCAD BIM eBook v2 ENG

Read a special TeamCAD eBook edition covering BIM & Digital Twins recent articles by our BIM associate Mr. Predrag Jovanović. --- Pročitajte specijalni TeamCAD eBook na temu BIM i digitalnih blizanaca našeg specijalnog BIM saradnika Predraga Jovanovića.

Read a special TeamCAD eBook edition covering BIM & Digital Twins recent articles by our BIM associate Mr. Predrag Jovanović. --- Pročitajte specijalni TeamCAD eBook na temu BIM i digitalnih blizanaca našeg specijalnog BIM saradnika Predraga Jovanovića.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

parameter naming ensures

successful implementation of BIM

design process automation and

visualization of data obtained

from that process. So, in the part

of the BIM modelling convention

about the generation and

management of BIM data, the

most commonly defined are:

• BIM elements naming convention;

• The naming convention of

parameters of BIM elements;

• Data management methodology

in a multidisciplinary BIM

environment;

• Filter color coding as preparation

for BIM data visualization;

• BIM data visualization methodology.

Unlike the part of the BIM

modelling convention related to

the BIM modelling process, which

is more concerned with geometric

data, the part of the BIM

modelling convention on the

methodology of generating and

managing BIM data forms the

core of successful or unsuccessful

BIM implementation, because

information - data in the BIM

model make the key difference

between 3D models and BIM

models.

Therefore, we are going also to

consider the issue of interaction,

on the one hand, the BIM design

process automation and data

visualization, and on the other,

the BIM modelling convention.

Is It Possible To

Successfully

Automate The BIM

Project Process And

Visualize Data

Without The

BIM Modelling

Convention?

I have a very simple answer to

this question and it says NO. Why

is it not possible to automate the

BIM project process and visualize

data without a modleling

convention? I think I am going to

answer this question in one very

simple example.

About half a year ago, I attended

a very interesting webinar on

data, where one of the

presenters was a programmer

from a company that wrote a

package for the visual

programming language Dynamo.

Because part of the presentation

also included a live

demonstration of the Dynamo

package tool, at one point the

presenter wanted to filter and

isolate all the trees in his BIM

model to further process the data

and then visualize that data.

He chose the „tree“ parameter as

the criterion for filtering elements

in his BIM model and hit the

"Run" button in his script. We all

naturally expected that after the

"Run" button in the Dynamo

script was pressed, only the trees

would be visible. However, this

did not happen, the screen

remained completely blank, so

JAN 2021

HTTPS://WWW.TEA

TeamCAD BIM

059

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!