elements during and at the end

of each project phase.

All of the above leads us to the

logical conclusion that the levels

of detail of the BIM elements

change at each project phase

during the project life cycle.

One has to be very careful about

the required level of detail of BIM

elements during each project

phase, primarily for coordinated

exchange of BIM data during the

BIM project process and then for

financial reasons, since all

participants in the project

process should be aware of the

fact that the higher requirement

in terms of the level of detail of

BIM elements at some phase of

the project, the higher work, and

therefore the higher cost of

generating BIM geometry and

data in the BIM discipline model.

After defining exactly what the

LOD or the level of detail of BIM

elements means and explaining

in principle the relationship

between the level of detail of BIM

elements and project phases,

logical questions arise:

of data have to match?

• How to verify the

implementation of BIM element

LOD?

• Is the chapter on the LOD of the

BIM elements sufficient to ensure

efficient coordination of the BIM

model and the exchange of data

from all participants in the BIM

project process?

Below, I will give you a detailed

answer and explanation for each

question asked.

Who Defines The

Level Of Detail Of

Bim Elements?

Bearing in mind that the interests

of the designer, contractor and

investor do not completely

coincide during the BIM project

process, I do not think it is

possible to give a simple answer

to the question which party in the

project process needs to define

precisely the level of detail of the

BIM elements.

First, it should also be borne in

mind that the BEP chapter, which

deals with the level of detail of

BIM elements, most commonly

defines the graphical layout of

BIM elements and the data

assigned to those elements in

BIM discipline models. Indirectly,

the BIM element LOD also affects

the multidisciplinary BIM

workflow and data sharing in a

multidisciplinary BIM

environment by placing clear

requirements on the BIM

element LOD in front of the

disciplines designers, both

graphically and in terms of data

that the BIM discipline model

should include.

All this provides a framework for

discipline designers to exchange

information efficiently from the

BIM discipline model, and it is

therefore very valuable to set the

level of detail of the BIM

elements to the discipline

designers, which would allow

them to exchange data as

efficiently as possible within the

BIM project process during a

particular project phase.

Considering all the above in the

article section on who defines the

level of detail of BIM elements, I

think it is most logical that the

investor is a participant in the

project whose interest is to

manage the LOD requirements of

BIM elements for each discipline

in the BIM project process.

• Who defines the level of detail

of BIM elements?

• How to define the level of detail

of BIM elements depending on

the project phases?

• Do the graphic level of detail of

BIM elements and level of detail

JAN 2021

HTTPS://WWW.TEA

TeamCAD BIM

053

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!