The reasons for this are many,

and I m going to list only the

most important:

• Better control over the process

of generating graphic

documentation and data in BIM

discipline models at each project

phase;

• Optimized transition to the

next phase of the project in the

BIM project process;

• Easier establishment of

automation of the BIM project

process, which results in the

absolute accuracy of the

generated data and more

efficient exchange of data

between different disciplines in

the BIM project process; more on

that topic, you can find in the

article „BIM Workflow

Automation“

• Reduction of design costs

through automation of the BIM

project process;

• By controlling and managing

the LOD requirements of BIM

elements, the investor gets a

cheaper BIM as built model,

which can serve as a very good

basis for the FM model and

digital twin model; read more in

the article "What Are The Digital

Twins?"

Following the reasons why an

investor should manage the LOD

requirements of BIM elements, it

is important to note that it is very

easy for an investor to achieve

the above goals by hiring a BIM

Manager or BIM Consultant, who

with his knowledge and experience

could bring significant

financial savings to the investor

through optimization of requirements

of the LOD of BIM

elements at all phases of the

project in order to establish the

most efficient BIM project

process.

How To Define The

Level Of Detail Of

Bim Elements Depending

On The

Project Phases?

Fortunately, the answer to this

question is not that complicated.

Specifically, the BIM project

process monitors the requirements

of each project phase, so

the direct relationship between

the LOD of the BIM elements and

each project phase is more than

obvious, with some exceptions.

I m going to try in a very simple

way to explain the requirements

of each LOD of BIM elements

during the project phases

through a very simple example -

the evolution of the door LOD

through the different phases of

the project:

After a very simplified way of

reviewing the requirements of

the LOD of the BIM elements

according to the project phases, I

think it would be useful to also

make a description of each level

of detail of the BIM elements -

LOD level:

• LOD 100:

• graphic requirements - the

most basic 3D geometry;

• parameters - the most basic

geometry without material data;

• LOD 200:

• graphic requirements – 3D

geometry;

• parameters - the most basic

data of elements materials;

• LOD 300/350:

• graphic requirements - 3D

geometry with details sufficient

for the preparation of tender

documents;

• parameters - information on

the materials of the elements

sufficient for the preparation of

the tender documentation;

• LOD 400:

• graphic requirements -

detailed 3D geometry with details

sufficient for the construction

state project;

• parameters - information on

the elements materials sufficient

for the construction state project;

• LOD 500:

• graphic requirements -

detailed 3D geometry with details

sufficient to produce the as built

project, FM model and digital

twin;