TeamCAD BIM eBook v2 ENG
Read a special TeamCAD eBook edition covering BIM & Digital Twins recent articles by our BIM associate Mr. Predrag Jovanović. --- Pročitajte specijalni TeamCAD eBook na temu BIM i digitalnih blizanaca našeg specijalnog BIM saradnika Predraga Jovanovića.
Read a special TeamCAD eBook edition covering BIM & Digital Twins recent articles by our BIM associate Mr. Predrag Jovanović. --- Pročitajte specijalni TeamCAD eBook na temu BIM i digitalnih blizanaca našeg specijalnog BIM saradnika Predraga Jovanovića.
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
model enables big savings in
facility maintenance through the
cost optimization of facility
lifecycle and equipment built into
it.
After the introduction, let me
continue with considering what
way the investor can make
considerable savings with BEP
making and the control of its
implementation in the BIM
project process. I am going to
present a few ideas and
conclusions, which, I am sure,
bring considering benefit to the
investor:
• The consistency of the BIM
discipline models during all
phases of the BIM project process
allows the investor large savings;
• Well designed and implemented
BIM modelling convention brings
the investor big savings;
• By optimizing the
multidisciplinary coordination of
the BIM discipline models, the
investor achieves great savings;
• By optimizing BIM elements
LOD, the investor achieves big
savings;
• By optimizing CDE (Common
Data Environment), the investor
achieves great savings.
All the above-mentioned
recommendations and
conclusions can bring significant
savings in the BIM project
process to the investor and they
can be explained in detail. Also, I
think that the above-mentioned
conclusions need to be confirmed
with some examples from the
real BIM project environment,
which I am going to do below.
So let's go in order…
Note: In the following text, I am
going to explain in detail all the
above-mentioned conclusions
and recommendations based on
my personal experience and very
successful BIM project process
implementation for one of the
biggest investors and data center
owners in the world.
The Consistency Of
The BIM Discipline
Models During All
Phases Of The
BIMProject Process
Allows The Investor
Large Savings
I am not sure that the vast
majority of readers understand
why it is necessary to ensure the
consistency of the BIM discipline
models during all project phases
and how this allows the investor
great savings, so I think it is
necessary to explain this
conclusion in detail.
For a start, it would be good to try
to put yourself in the role of an
investor and consider what would
be in your interest, and that is
related to the consistency of the
BIM discipline models during all
phases of the BIM project
process.
JAN 2021