10.01.2013 Views

unclassified

unclassified

unclassified

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNCLASSIFIED<br />

MODIFICATION TITLE: ARCI Shore Electronics<br />

COST CODE:<br />

MODELS OF SYSTEMS AFFECTED:<br />

VG010<br />

DESCRIPTION/JUSTIFICATION:<br />

ARCI Shore Electronics provides SURTASS Signal Processing and Display Suites at two Naval Oceanographic Processing Facilities (NOPF).<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

N/A<br />

Prior Yrs FY 03 FY 04 FY 05 FY06 FY07 FY08 FY09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E 0.000 0.000<br />

PROCUREMENT: 0.000 0.000<br />

Kit Quantity 0.000 0.000<br />

Installation Kits 0.000 0.000<br />

Installation Kits Nonrecurring 0.000 0.000<br />

Equipment 2.000 1.594 2.000 1.594<br />

Equipment Nonrecurring 0.000 0.000<br />

Engineering Change Orders 0.000 0.000<br />

Data 0.000 0.000<br />

Training Equipment 0.000 0.000<br />

Support Equipment 0.000 0.000<br />

Other 0.000 0.000<br />

Interim Contractor Support 0.000 0.000<br />

Installation of Hardware 0.000 0.000 2.000 0.156 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.000 0.156<br />

PRIOR YR EQUIP 0.000 0.000<br />

FY 02 EQUIP 0.000 0.000<br />

FY 03 EQUIP 2.000 0.156 2.000 0.156<br />

FY 04 EQUIP 0.000 0.000<br />

FY 05 EQUIP 0.000 0.000<br />

FY 06 EQUIP 0.000 0.000<br />

FY 07 EQUIP 0.000 0.000<br />

FY 08 EQUIP 0.000 0.000<br />

FY 09 EQUIP 0.000 0.000<br />

FY TC EQUIP 0.000 0.000<br />

TOTAL INSTALLATION COST 0.000 0.000 2.000 0.156 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.000 0.156<br />

TOTAL PROCUREMENT COST 0.000 0.000 2.000 1.750 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.000 1.750<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 month PRODUCTION LEADTIME: 9 months<br />

CONTRACT DATES: FY2002: FY2003: Dec. 02 FY2004: FY2005:<br />

DELIVERY DATES: FY2002: FY2003: Aug. 03 FY2004: FY2005:<br />

FY04 FY 05 FY 06 FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 2<br />

OUTPUT 1 1<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 2<br />

OUTPUT 2<br />

Notes/Comments<br />

P3a IMP Item No. 40-16 of 40-16<br />

February 2004<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!