UNCLASSIFIED<br />

MODIFICATION TITLE: SHIP TACTICAL COMMUNICATIONS February 2004<br />

COST CODE DN016/NU016<br />

MODELS OF SYSTEMS AFFECTED: HIGH FREQUENCY RADIO GROUP<br />

DESCRIPTION/JUSTIFICATION: Provides for fully automated operation of the High Frequency Communications System.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07<br />

FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment [33] [41.5] [0] [0.0] [1] [3.5] 2 6.4 0 0.0 2 6.4<br />

Equipment Nonrecurring - HF ALE (URC 109) [0.5] 0.0<br />

Equipment Nonrecurring - HF ALE (VRC104) [0.6] 8.6<br />

ECO-Upgrade CV-67 ad CG-60<br />

Data<br />

Training Equipment<br />

2 2.7 2 2.7<br />

Production Support [1.4] [1.3] [0.8] 1.9 0.7 2.6<br />

Other (DSA)<br />

Interm Contractor Support<br />

[0.7] [0.5] [0.3] 2.8 0.2 3.0<br />

Installation of Hardware [31] [41.6] [1] [2.2] [0] [0.2] 1 2.0 4 8.9 0 0.0 0 0.0 0 0.0 0 0.0 5 10.9<br />

PRIOR YR EQUIP [31] [41.6] [1] [2.2] 0 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP [0] [0.2] 1 2.0 1 2.0<br />

FY 04 EQUIP 4 8.9 4 8.9<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST [41.6] [2.2] [0.2] 2.0 8.9 0.0 0.0 0.0 0.0 0.0 10.9<br />

TOTAL PROCUREMENT COST [85.2] [4.0] [5.7] 24.5 9.8 0.0 0.0 0.0 0.0 0.0 34.3<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 mos PRODUCTION LEADTIME: 12 mos<br />

CONTRACT DATES: FY 2002: N/A FY 2003: Sep-03 FY 2004: Jan-04 FY 2005: N/A<br />

DELIVERY DATES: FY 2002: N/A FY 2003: Nov-04 FY 2004: Mar-05 FY 2005: N/A<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT [32] 1 2 2<br />

OUTPUT [32] 1 2 2<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 5<br />

OUTPUT 5<br />

Notes/Comments<br />

1/ FY03 and Prior: The HFRG budget was included under BLI 3057 Comm Items Under $5M. Provided for informational purposes only. Total inventory objective is 36 units. 34 units procured under BLI 3057. 2 units will be procured under BLI 3010.<br />

2/ The installation of the FY01 procurement of a 12 KW system was cancelled due to ship being decommissioned (LHA-3). This asset is being converted into<br />

two HFRG (8kw & 4kw) systems in FY04 via an Engineering Change Order for the CV-67 and the CG-60.<br />

3/ FY03 install includes installation of the HF ALE upgrades.<br />

4/ FY04 production support increases due to new version of system requiring additional initial ILS documentation.<br />

6/ FY05 install includes the FY04 HFALE procurements<br />

7/ FY04 Procurements includes 47 VRC104s<br />

P-1 Shopping List - Item No 75 - 5 of 7<br />

Exhibit P-5, Budget Item Justification<br />

Unclassified<br />