UNCLASSIFIED<br />

MODIFICATION TITLE: Automated Digital Network System (ADNS). 1/<br />

COST CODE PQ0069/PQ776<br />

MODELS OF SYSTEMS AFFECTED: Automated Digital Network System (ADNS) Ashore / Network Operations Center (NOC).<br />

DESCRIPTION/JUSTIFICATION: Automated Digital Network System (ADNS) implements ATM multiplexing technology, and JDIICS-D compliant Integrated Network Management tools. It adds SCI ADNS Architecture, Integrated Network Management<br />

Architecture, and supports legacy system programs. FY02 and prior includes Fleet Network Operation Centers (NOCs) Ashore.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07<br />

FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 23 12.961 7 4.098 6 8.869 9 8.960 9 7.579 9 3.863 9 2.497 9 1.241 Cont. Cont. 81 50.1<br />

Equipment Nonrecurring 0 0.0<br />

Engineering Change Orders 0 0.0<br />

Data 0 0.0<br />

Training Equipment 0 0.0<br />

Production Support 0.426 0.000 0.325 0.350 0.175 0.100 0.060 0 1.4<br />

Other (DSA) 0 0.0<br />

Interm Contractor Support 0 0.0<br />

Installation of Hardware* 23 7.002 7 1.711 6 1.450 0 0.000 9 4.464 9 4.088 9 1.887 9 0.997 9 0.700 Cont. Cont. 81 22.3<br />

PRIOR YR EQUIP 23 7.002 23 7.0<br />

FY 00 EQUIP 0 0.0<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 7 1.711 7 1.7<br />

FY 03 EQUIP 6 1.450 6 1.5<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 9 4.483 9 4.5<br />

FY 06 EQUIP 9 4.094 9 4.1<br />

FY 07 EQUIP 9 1.890 9 1.9<br />

FY 08 EQUIP 9 0.997 9 1.0<br />

FY 09 EQUIP 9 0.698 9 0.7<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 7.002 1.711 1.450 0.000 4.464 4.088 1.887 0.997 0.700 Cont. 81 22.3<br />

TOTAL PROCUREMENT COST 19.963 5.809 10.745 0.000 13.749 12.017 5.925 3.594 2.001 Cont. 73.8<br />

METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 1 month PRODUCTION LEADTIME: 5 months<br />

CONTRACT DATES: FY2003: Dec-02 FY2004: FY2005: Nov-04<br />

DELIVERY DATES: FY2003: Apr-03 FY2004: FY2005: Apr-05<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 36 9 9<br />

OUTPUT 36 9 9<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 9 9 9 Cont. 81<br />

OUTPUT 9 9 9 Cont. 81<br />

Notes/Comments<br />

1/ Total Quantity listed on this P-3A represent systems procured and installed, including refresh equipment, and is not an Inventory Objective. Program Continues Beyond FYDP.<br />

13 of 22<br />

P-1 SHOPPING LIST<br />

ITEM NO.<br />

76<br />

P-3A Exhibit<br />

February 2004

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!