10.01.2013 Views

unclassified

unclassified

unclassified

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UNCLASSIFIED<br />

February 2004<br />

MODIFICATION TITLE: 261100 Naval Tactical Command Support System Ship Set Equipment Upgrades (52DY/DY005).<br />

MODELS OF SYSTEMS AFFECTED: Provides modern centrally managed mission support ADP system upgrades and NTCSS-Optimized software to replace aging systems for Battle Group and unit level ships.<br />

DESCRIPTION/JUSTIFICATION: Application subsystems include/financial/inventory management, organizational and surface maintenance management, and administrative information systems support. NTCSS procurements will also<br />

provide ship capabilities for displaying and storing Computer-aided Acquisition and Logistics Support (CALS) initiative information (digitized engineering drawings, automated technical manuals, etc.).<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 126 55.3 17 5.2 12 3.5 38 14.6 8 2.5 91 33.2 0 0.0 0 0.0 5 1.5 Continuing 0.0 297 115.8<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 4.9 0.4 0.3 1.2 0.2 2.6 0.0 0.0 0.1 Continuing 0.0 9.7<br />

Other (DSA) 1.6 0.1 0.1 0.7 0.3 1.8 0.0 0.0 0.1 Continuing 0.0 4.7<br />

Interm Contractor Support<br />

Installation of Hardware* 120 19.7 20 6.5 14 3.7 33 3.5 11 1.0 94 12.1 0 0.0 0 0.0 5 0.4 Continuing 0.0 297 46.9<br />

PRIOR YR EQUIP 120 19.7 120 19.7<br />

FY 01 EQUIP 6 2.4 6 2.4<br />

FY 02 EQUIP 14 4.1 3 1.2 17 5.3<br />

FY 03 EQUIP 11 2.5 1 0.1 12 2.6<br />

FY 04 EQUIP 32 3.4 6 0.6 38 4.0<br />

FY 05 EQUIP 5 0.4 3 0.3 8 0.7<br />

FY 06 EQUIP 91 11.8 91 11.8<br />

FY 07 EQUIP 0 0.0 0 0.0<br />

FY 08 EQUIP 0 0.0 0 0.0<br />

FY 09 EQUIP 5 0.4 5 0.4<br />

FY TC EQUIP<br />

TOTAL INSTALLATION COST 120 19.7 20 6.5 14 3.7 33 3.5 11 1.0 94 12.1 0 0.0 0 0.0 5 0.4 297 46.9<br />

TOTAL PROCUREMENT COST 81.5 12.2 7.6 20.0 4.0 49.7 0.0 0.0 2.1 177.1<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 2 months PRODUCTION LEADTIME: 2 months<br />

CONTRACT DATES: FY 2003: Nov-02 FY 2004: Nov-03 FY 2005: Nov-04<br />

DELIVERY DATES: FY 2003: Jan-03 FY 2004: Jan-04 FY 2005: Jan-05<br />

FY04 FY05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 154 1 10 11 11 6 1 2 2 3 30 30 31<br />

OUTPUT 154 1 10 11 11 6 1 2 2 3 30 30 31<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL *<br />

INPUT 0 0 0 0 0 0 1 2 2 297<br />

OUTPUT 0 0 0 0 0 0 1 2 2 297<br />

* NTCSS Afloat Inventory Objective is 256. Total quantity indicate hardware & Software<br />

upgrades, procurement, Y2K fixes and installation.<br />

P-1 SHOPPING LIST<br />

ITEM NO. 49-6 of 49-8<br />

P-3A Exhibit,Individual Modification History<br />

UNCLASSIFIED

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!