10.01.2013 Views

unclassified

unclassified

unclassified

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNCLASSIFIED<br />

February 2004<br />

MODIFICATION TITLE: Tactical/Mobile Communications & Mobility Upgrades<br />

COST CODE JG050<br />

MODELS OF SYSTEMS AFFECTED: N/A<br />

DESCRIPTION/JUSTIFICATION: This line procures various types of Communications and Mobility Equipment in order to provide an upgraded capability to present TSC systems and to replace the equipment when it has reached the end of service<br />

life, assuring the existing system remains interoperable with Joint and Naval Forces, as well as updated aircraft, sensors, and weapons systems.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 20 12.03 14 5.05 9 9.68 15 8.27 14 4.43 13 6.53 7 4.45 9 4.27 13 10.01 CONT CONT CONT CONT<br />

Equipment (TSC - fixed sites) 20 12.03 14 5.05 9 9.68 9 2.89 7 1.40 5 3.62 2 1.31 2 1.34 6 4.80 CONT CONT CONT CONT<br />

Equipment (Mobile Systems) 6 5.37 7 3.02 8 2.91 5 3.14 7 2.93 7 5.21 CONT CONT CONT CONT<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA)<br />

Interm Contractor Support<br />

Installation of Hardware 19 4.19 14 1.32 10 1.37 9 0.37 7 0.79 5 0.82 2 0.25 2 0.23 6 0.61 CONT CONT 74 9.94<br />

PRIOR YR EQUIP 19 4.19 19 4.19<br />

FY 01 EQUIP 1 0.26 1 0.26<br />

FY 02 EQUIP 13 1.06 1 0.20 14 1.26<br />

FY 03 EQUIP 9 1.16 9 1.16<br />

FY 04 EQUIP 9 0.37 9 0.37<br />

FY 05 EQUIP 7 0.79 7 0.79<br />

FY 06 EQUIP 5 0.82 5 0.82<br />

FY 07 EQUIP 2 0.25 2 0.25<br />

FY 08 EQUIP 2 0.23 2 0.23<br />

FY 09 EQUIP 6 0.61 6 0.61<br />

FY TC EQUIP CONT CONT CONT CONT<br />

TOTAL INSTALLATION COST 4.19 1.32 1.37 0.37 0.79 0.82 0 0.23 0.61 CONT CONT CONT 9.94<br />

TOTAL PROCUREMENT COST 16.22 6.37 11.05 8.64 5.21 7.35 4.70 4.50 10.62 CONT 0 CONT 9.94<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: Various PRODUCTION LEADTIME: Various<br />

CONTRACT DATES: FY 2003: various FY 2004: various FY 2005: various<br />

DELIVERY DATES: FY 2003: various FY 2004: various FY 2005: various<br />

FY 03 FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 33 2 4 4 3 3 3 1 2 4 1 2 2<br />

OUTPUT 33 2 4 4 3 3 3 1 2 4 1 2 2<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 1 1 1 1 1 2 3 CONT CONT<br />

OUTPUT 1 1 1 1 1 2 3 CONT CONT<br />

Notes/comments:<br />

For FY03 through FY07, quantities represent only the Comms & Mobility component system upgrades of T/M TSC systems. Total I/O is 14.<br />

Mobile systems in the Tac/Mobile program are procured "turn key".<br />

P-1 Shopping List-Item No 48 - 15 of 15<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!