10.01.2013 Views

unclassified

unclassified

unclassified

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: AI&R SENSORS (BACKMODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIPYARD<br />

ADMINISTRATIVE LEADTIME: 3-4 MOS PRODUCTION LEADTIME: 12 Months<br />

CONTRACT DATES: FY 2002: N/A FY 2003: 2/01 FY 2004: FY 2005: 2/03<br />

DELIVERY DATE: FY 2002: N/A FY 2003: 2/02 FY 2004: FY 2005: 2/04<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 0 0.000<br />

FY 2002 EQUIPMENT 0 0.000<br />

FY 2003 EQUIPMENT 0 0.000<br />

FY 2004 EQUIPMENT 0 0.000<br />

FY 2005 EQUIPMENT 2 0.400 2 0.400<br />

FY 2006 EQUIPMENT 11 2.200 11 2.200<br />

FY 2007 EQUIPMENT 11 2.200 11 2.200<br />

FY 2008 EQUIPMENT 13 2.600 13 2.600<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

17 3.400 17 3.400<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 2 3 4 2 2 3 4 2 3 4 4 2 17 54<br />

Out 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 2 3 4 2 2 3 4 2 3 4 4 2 17 54<br />

P-3A<br />

ITEM N0. 33 PAGE 30 CLASSIFICATION: UNCLASSIFIED

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!