10.01.2013 Views

unclassified

unclassified

unclassified

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: CVs, CVNs, LHDs, LHAs, MODIFICATION TITLE: AN/TPX-42A(V)14 Upgrade C Kit (MP046)<br />

and selected shore sites.<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: 2 Months PRODUCTION LEADTIME: 10 Months<br />

CONTRACT DATES: FY 2003: N/A FY 2004: 12/03 FY 2005: 12/04<br />

DELIVERY DATE: FY 2003: N/A FY 2004: 10/04 FY 2005: 10/05<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT<br />

FY 2004 EQUIPMENT AP 0.194 1 1.911<br />

1 2.105<br />

FY 2005 EQUIPMENT AP 0.197 2 1.944<br />

2 2.141<br />

FY 2006 EQUIPMENT AP 0.109 2 0.875<br />

2 0.984<br />

FY 2007 EQUIPMENT AP 0.136 2 1.342<br />

2 1.478<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

AP 0.138 2 1.366<br />

2 1.504<br />

TO COMPLETE AP 0.070 6 3.080 6 3.150<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 0 0 1 1 0 0 1 1 0 0 1 1 0 0 6 15<br />

Out 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 1 0 1 0 1 0 0 1 1 0 1 0 1 0 6 15<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 58 PAGE NO. 5G CLASSIFICATION: UNCLASSIFIED

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!