UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR118<br />

MODELS OF SYSTEMS AFFECTED: JMINI Control System - NMS<br />

DESCRIPTION/JUSTIFICATION: The Network Management System (NMS) component of the JMINI Control System provides communications resource planning and management via secure WAN connections between the control stations and remote<br />

user. Will provide dynamic centralized control of joint operable 5 KHz and 25 KHz ultra high frequency military satellite communications.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 13 32.5 22 12.6 7 4.0 12 7.7 10 6.2 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 64 63.0<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 0.7 2.6 0.2 1.0 0.6 5.2<br />

Other (DSA)<br />

Interim Contractor Support<br />

Installation of Hardware* 8 1.4 9 0.5 20 1.2 17 0.7 10 0.2 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 64 3.9<br />

PRIOR YR EQUIP 8 1.4 5 0.3 13 1.6<br />

FY 02 EQUIP 4 0.2 18 1.1 22 1.3<br />

FY 03 EQUIP 2 0.1 5 0.2 7 0.3<br />

FY 04 EQUIP 12 0.5 12 0.5<br />

FY 05 EQUIP 10 0.2 10 0.2<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 1.4 0.5 1.2 0.7 0.2 0.0 0.0 0.0 0.0 0.0 3.9<br />

TOTAL PROCUREMENT 34.6 15.6 5.4 9.4 7.1 0.0 0.0 0.0 0.0 0.0 72.1<br />

METHOD OF IMPLEMENTATION ADMINISTRATIVE LEAD-TIME: 1 Month PRODUCTION LEAD-TIME: 6 Months<br />

CONTRACT DATES: FY 2003: Dec-02 FY 2004: Dec-03 FY 2005: Oct-04 FY 2006:<br />

DELIVERY DATES: FY 2003: Jul-03 FY 2004: Jul-04 FY 2005: Jul-05 FY 2006:<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 37 5 12 10<br />

OUTPUT 37 5 12 10<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 64<br />

OUTPUT 0 64<br />

Notes/Comments<br />

FY07<br />

FY08<br />

P-1 Shopping List - Item No 80 - 49 of 54<br />

FY09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />