10.01.2013 Views

unclassified

unclassified

unclassified

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNCLASSIFIED<br />

MODIFICATION TITLE: VIXS (Video Information Exchange System)-SHIP INSTALLATION Feb-04<br />

COST CODE NU239<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: Provides multifunctional information exchange systems capable of interactive imagery and video teleconferencing.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08<br />

FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

53 2.5 7 0.7 3 0.2 4 0.4 4 0.3 cont. 71 4.1<br />

Production Support 0.2 0.5 0.4 0.1 0.1 1.3<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.4 0.1 0.1 0.1 0.1 0.7<br />

Installation of Hardware 49 2.4 9 0.4 5 0.5 4 0.3 4 0.4 cont. 71 3.9<br />

PRIOR YR EQUIP 49 2.4 4 0.2 53 2.5<br />

FY 02 EQUIP 5 0.2 2 0.2 7 0.4<br />

FY 03 EQUIP 3 0.3 3 0.3<br />

FY 04 EQUIP 4 0.3 4 0.3<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 4 0.4 4 0.4<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP cont. 0 0.0<br />

TOTAL INSTALLATION COST 2.4 0.4 0.5 0.3 0 0.4 0 0 0 0 3.9<br />

TOTAL PROCUREMENT COST 5.5 1.6 1.1 1.0 0.0 0.9 0 0 0 0 10.1<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 mos PRODUCTION LEADTIME: 3 mos<br />

CONTRACT DATES: FY 2002: Dec-01 FY 2003: Dec-02 FY 2004: Dec-03 FY 2005: N/A<br />

DELIVERY DATES: FY 2002: Mar-02 FY 2003: Mar-03 FY 2004: Mar-04 FY 2005: N/A<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 63 2 2 2 2<br />

OUTPUT 63 2 2 2 2<br />

INSTALLATION SCHEDULE: FY 07 FY 08 FY 09<br />

1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT<br />

cont. 71<br />

OUTPUT<br />

cont. 71<br />

Notes/Comments<br />

Exhibit P-3a, Individual Modification Program<br />

Unclassified<br />

Classification<br />

P-1 Shopping List - Item No 77 Page 11 of 20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!