10.01.2013 Views

unclassified

unclassified

unclassified

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CLASSIFICATION: UNCLASSIFIED May-2002<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: OA 9070 A/B UPGRADE MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIP ALT<br />

ADMINISTRATIVE LEADTIME: 24 MOS PRODUCTION LEADTIME: 6 - 8 Months<br />

CONTRACT DATES: FY 2002: 2/02 FY 2003: 2/03 FY 2004: 2/04 FY 2005: 2/05<br />

DELIVERY DATE: FY 2002: 10/02 FY 2003: 10/03 FY 2004: 10/04 FY 2005: 10/05<br />

($ in Millions)<br />

Cost: FY 2001 & Prior FY2002 FY 2003 FY2004 FY2005 FY2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 10 17.085 5 7.905 15 24.990<br />

FY 2002 EQUIPMENT 7 9.613 7 9.613<br />

FY 2003 EQUIPMENT 5 9.924 5 9.924<br />

FY 2004 EQUIPMENT 3 5.955 2 4.734 5 10.689<br />

FY 2005 EQUIPMENT 1 2.530 1 2.530<br />

FY 2006 EQUIPMENT 0 0.000<br />

FY 2007 EQUIPMENT 0 0.000<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

0 0.000<br />

INSTALLATION SCHEDULE:<br />

FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 10 3 1 2 0 2 3 2 0 2 1 1 1 3 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 33<br />

Out 10 3 1 2 0 2 3 2 0 2 1 1 1 3 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 33<br />

NOTE: DUE TO THE 1 OCTOBER 2004 AVAILABILITY FOR 3 SHIPS THEIR INSTALLATION IS FUNDED WITH FY04 FUNDS.<br />

P-3A<br />

ITEM NO. 33 PAGE 48 CLASSIFICATION: UNCLASSIFIED

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!