10.01.2013 Views

unclassified

unclassified

unclassified

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: ACTIVE INTERCEPT & RANGING KITS TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS<br />

DESCRIPTION/JUSTIFICATION:<br />

The installation funding cited for FY 2003 and FY 2004 ($1.1M) is for Design Services (SHIPALT package development). Replaces obsolete WLR-9 electronics with COTS Open Architecture digital<br />

processor integrated with ARCI, on both SSN and SSBN. Installed with sensor which improves accuracy and fidelity.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0.000<br />

PROCUREMENT<br />

INSTALLATION KITS (INTERCEPT) 9 6.201 5 4.000 9 6.000 10 7.300 13 9.700 5 3.785 7 5.411 58 42.397<br />

INSTALLATION KITS - UNIT COST 0.689 0.800 0.667 0.730 0.746 0.757 0.773<br />

INSTALLATION KITS NONRECURRING 0.000<br />

EQUIPMENT (SENSOR) 0 0.000<br />

EQUIPMENT (SENSOR) - UNIT COST<br />

ENGINEERING CHANGE ORDERS 0.000<br />

DATA 0.000<br />

TRAINING EQUIPMENT 0.000<br />

SUPPORT EQUIPMENT 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

INTERIM CONTRACTOR SUPPORT 0.000<br />

INSTALL COST 1.000 9 3.400 5 1.300 9 2.300 10 2.700 13 3.500 5 1.350 7 1.960 58 17.510<br />

TOTAL PROCUREMENT 0.000 7.201 7.400 7.300 9.600 12.400 7.285 6.761 1.960 59.907<br />

ITEM 33 PAGE 27 CLASSIFICATION: UNCLASSIF

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!