10.01.2013 Views

unclassified

unclassified

unclassified

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNCLASSIFIED<br />

MODIFICATION TITLE: Tactical Switching 1/<br />

COST CODE PQ070/PQ776<br />

MODELS OF SYSTEMS AFFECTED: Automated Digital Multiplexer System (ADMS) - Afloat<br />

DESCRIPTION/JUSTIFICATION: Automated Network management capability which is fully compatible with switching technologies and in compliance with national and international standards.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07<br />

FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 0.000 0 0.000 0 0.000 0 0.000 46 10.360 43 10.227 41 9.763 Cont. 130 30.4<br />

Equipment Nonrecurring 0 0.0<br />

Engineering Change Orders 0 0.0<br />

Data 0 0.0<br />

Training Equipment 0 0.0<br />

Production Support 0.000 0.000 0.000 0.000 0.532 0.499 0.509 Cont. 0 1.5<br />

Other (DSA) 0.245 0.237 0.207 0 0.7<br />

Interm Contractor Support 0 0.0<br />

Installation of Hardware* 0 0.000 0 0.000 0 0.000 0 0.000 46 3.338 43 3.311 41 2.924 0 0.0 0 0.0 Cont. 130 9.6<br />

PRIOR YR EQUIP 0 0.000 0 0.0<br />

FY 00 EQUIP 0 0.0<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.000 0 0.0<br />

FY 03 EQUIP 0 0.000 0 0.0<br />

FY 04 EQUIP 0 0.000 0 0.0<br />

FY 05 EQUIP 46 3.338 46 3.3<br />

FY 06 EQUIP 43 3.316 43 3.3<br />

FY 07 EQUIP 41 2.929 41 2.9<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.000 0.000 0.000 0.000 3.338 3.311 2.924 0.0 0.0 Cont. 130 9.6<br />

TOTAL PROCUREMENT COST 0.000 0.000 0.000 0.000 14.475 14.274 13.403 0.0 0.0 Cont. 42.2<br />

METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 3 months PRODUCTION LEADTIME: 4 months<br />

CONTRACT DATES: FY2003: FY2004: FY2005: Dec-04<br />

DELIVERY DATES: FY2003: FY2004: FY2005: Apr-05<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 0 25 21 22 21<br />

OUTPUT 0 25 21 22<br />

FY 07<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 21 20 0 130<br />

OUTPUT 21 21 20 0 130<br />

Notes/Comments<br />

1/ For FY05 - FY07, ADMS Afloat equipment will be replaced to satisfy increased IT-21 information transfer needs<br />

18 of 22<br />

P-1 SHOPPING LIST P-3A Exhibit<br />

ITEM NO.<br />

76<br />

February 2004

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!