10.01.2013 Views

unclassified

unclassified

unclassified

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNCLASSIFIED<br />

MODIFICATION TITLE: Shore Remote Control Systems (SRCS)/Element Management System -Ashore (EMS) 1/<br />

COST CODE PQ075/PQ776<br />

MODELS OF SYSTEMS AFFECTED: Various transmission media.<br />

DESCRIPTION/JUSTIFICATION: Automates and remotely controls communications switching and RF equipment which eliminates manual operations.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07<br />

FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 33 12.334 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.0 33 12.3<br />

Equipment Nonrecurring 0 0.0<br />

Engineering Change Orders 0 0.0<br />

Data 0 0.0<br />

Training Equipment 0 0.0<br />

Production Support 0.280 0.226 0.000 0.000 0.000 0.000 0.000 0.0 0 0.5<br />

Other (DSA) 0 0.0<br />

Interm Contractor Support 0 0.0<br />

Installation of Hardware* 33 5.987 0 0.000 0 0.045 0 0.000 0 0.000 0 0.000 0 0.000 0 0.0 0 0.0 0 0.0 33 6.0<br />

PRIOR YR EQUIP 33 5.987 33 6.0<br />

FY 00 EQUIP 0 0.0<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.000 0 0.0<br />

FY 03 EQUIP 0 0.045 0 0.0<br />

FY 04 EQUIP 0 0.000 0 0.0<br />

FY 05 EQUIP 0 0.000 0 0.0<br />

FY 06 EQUIP 0 0.000 0 0.0<br />

FY 07 EQUIP 0 0.000 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0 0 0.0<br />

TOTAL INSTALLATION COST 5.987 0.000 0.045 0.000 0.000 0.000 0.000 0.0 0.0 0.0 33 6.0<br />

TOTAL PROCUREMENT COST 18.601 0.226 0.045 0.000 0.000 0.000 0.000 0.0 0.0 0.0 18.9<br />

METHOD OF IMPLEMENTATION: AIT ADMINISTRATIVE LEADTIME: 3 months PRODUCTION LEADTIME: 4 months<br />

CONTRACT DATES: FY2003: N/A FY2004: FY2005:<br />

DELIVERY DATES: FY2003: N/A FY2004: FY2005:<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 33<br />

OUTPUT 33<br />

FY 07 FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL 2/<br />

INPUT 0 33<br />

OUTPUT 0 33<br />

Notes/Comments<br />

1/ Production support in FY02 includes transition of formal training to CNET, closing out production and transitioning assets to ISEA and completing remaining logistics documentation for turn over to ISEA<br />

2/ As a result of Navy decisions, this program will cease in FY02.<br />

3/ Prior year quantity includes 16 SRCS units.<br />

P-1 SHOPPING LIST<br />

ITEM NO.<br />

76<br />

19 of 22<br />

P-3A Exhibit<br />

February 2004

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!