10.01.2013 Views

unclassified

unclassified

unclassified

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

Aviation Capable Ships, Air Stations<br />

Aviation Units, Aviation Training Naval Mission Planning Systems (NavMPS) formerly<br />

MODELS OF SYSTEMS AFFECTED: Support Facilities MODIFICATION TITLE: Tactical Automated Mission Planning System (TAMPS) BLI 287600<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: Field Installation Team<br />

ADMINISTRATIVE LEADTIME: 3 to 4 Months PRODUCTION LEADTIME: 2 Months<br />

CONTRACT DATES: FY 2003: Jan-03 FY 2004: Jan-04 FY 2005: Jan-05<br />

DELIVERY DATE: FY 2003: Mar-03 FY 2004: Mar-04 FY 2005: Mar-05<br />

February 2004<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY FY To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 2851 7.0 2851 6.2<br />

FY 2003 EQUIPMENT 448 0.9 448 0.9<br />

FY 2004 EQUIPMENT 606 0.8 606 0.8<br />

FY 2005 EQUIPMENT 516 0.7 516 0.7<br />

FY 2006 EQUIPMENT<br />

FY 2007 EQUIPMENT<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 2851 448 606 516<br />

Out 2851 224 224 303 303 282 234<br />

P-3A<br />

ITEM NO. 65 PAGE 6 CLASSIFICATION: UNCLASSIFIED<br />

0.8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!