10.01.2013 Views

unclassified

unclassified

unclassified

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: CSA MK2 MOD 0 MODIFICATION TITLE: Six Inch External Countermeasures<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: Three phased refit/pierside installation<br />

ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME: 12 Months / 9 Months for kits<br />

CONTRACT DATES: FY 2003: 10/02 FY 2004: 10/03 FY 2005:<br />

DELIVERY DATE: FY 2003: 7/03 FY 2004: 7/04 FY 2005:<br />

($ in Millions)<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 0 0.0<br />

FY 2000 EQUIPMENT 0 0.0<br />

FY 2001 EQUIPMENT 0 0.0<br />

FY 2002 EQUIPMENT 2 1.50 2 1.50<br />

FY 2003 EQUIPMENT 1 0.83 1 0.83<br />

FY 2004 EQUIPMENT 0 0.0<br />

FY 2005 EQUIPMENT 0 0.0<br />

FY 2006 EQUIPMENT 0 0.0<br />

FY 2007 EQUIPMENT<br />

TO COMPLETE<br />

0 0.0<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 0 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3<br />

Out 0 0 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3<br />

P-3A<br />

ITEM 54 PAGE 9 CLASSIFICATION: UNCLASSIFIED

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!