10.01.2013 Views

unclassified

unclassified

unclassified

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CLASSIFICATION: UNCLASSIFIED<br />

P3A INDIVIDUAL MODIFICATION<br />

MODELS OF SYSTEM AFFECTED: 688 PHASE II - III KITS TYPE MODIFICATION: SHIP ALT MODIFICATION TITLE: SSN ACOUSTICS<br />

DESCRIPTION/JUSTIFICATION:<br />

688 TA - SA KIT; PROVIDES SPHERICAL ARRAY PROCESSING CAPABILITY<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN (IN MILLIONS)<br />

FY 2002 & Prior FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $ QTY $<br />

RDT&E 0 0.000<br />

PROCUREMENT<br />

INSTALLATION KITS 5 25.604 4 28.000 3 21.400 1 7.300 1 7.400 3 22.800 1 7.750 1 7.750 19 128.004<br />

INSTALLATION KITS - UNIT COST 5.121 7.000 7.133 7.300 7.400 7.600 7.750 7.750<br />

INSTALLATION KITS NONRECURRING 0.000<br />

EQUIPMENT 0.000<br />

EQUIPMENT NONRECURRING 0.000<br />

ENGINEERING CHANGE ORDERS 0.000<br />

DATA 0.000<br />

TRAINING EQUIPMENT 0 0.000<br />

SUPPORT EQUIPMENT 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

OTHER 0.000<br />

INTERIM CONTRACTOR SUPPORT 0.000<br />

INSTALL COST 5 11.144 4 9.400 3 7.200 1 2.400 1 2.400 3 7.500 1 2.550 1 2.550 19 45.144<br />

TOTAL PROCUREMENT 36.748 28.000 30.800 14.500 9.800 25.200 15.250 10.300 170.598<br />

ITEM 33 PAGE 15 CLASSIFICATION: UNCLASSIFIED

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!