10.01.2013 Views

unclassified

unclassified

unclassified

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNCLASSIFIED<br />

MODIFICATION TITLE: SCSS/CSRR-Non-Class Specific Test and Production Facilities<br />

COST CODE L0084<br />

MODELS OF SYSTEMS AFFECTED:<br />

DESCRIPTION/JUSTIFICATION: Installation of SCSS/CSRR<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E 0.8 0.8<br />

PROCUREMENT:<br />

Kit Quantity<br />

0 0.0 1 6.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 15 8.8 30 16.8 Cont. Cont.<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

0 0.0 0 0.0<br />

Equipment 1 6.0 0 0.0 0 0.0 0.0 0.0 15 8.8 30 16.8 Cont. Cont.<br />

Equipment Nonrecurring (See Note 1)<br />

0.0 0.0<br />

Engineering Change Orders 3.0 3.0<br />

Data<br />

Training Equipment<br />

Support Equipment<br />

(See Note 2)<br />

Production Support<br />

Interm Contractor Support<br />

0.3 0.4 0.0 0.0 0.0 0.0 0.0 1.6 1.8 Cont.<br />

Other (DSA) 0.0 0.0<br />

Installation of Hardware 0 0.0 0 0.0 1 0.6 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 15 4.7 Cont. Cont.<br />

PRIOR YR EQUIP 0 0.0<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 1 0.6 1 0.6<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 15 4.7 15 4.7<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.0 4.7 Cont. Cont. Cont.<br />

TOTAL PROCUREMENT COST 0.3 6.4 0.6 0.0 3.0 0.0 0.0 10.4 23.2 Cont. Cont. Cont.<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME:<br />

(See Note 3) CONTRACT DATES: FY 2002: FY 2003: FY 2004: FY 2005:<br />

DELIVERY DATES: FY 2002: FY 2003: FY 2004: FY 2005:<br />

FY 04 FY 05<br />

FY 06<br />

FY 07<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 1<br />

OUTPUT 1<br />

FY 08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT Cont Cont<br />

OUTPUT<br />

Notes/Comments:<br />

Cont Cont<br />

1) FY02 funded for procurement of (GOTS and COTS) equipment (terminals, workstations, cable, routers, cable harnesses) for CSRR Integration and Test Facility.<br />

2) FY 05 ECP to incorporate full Digital Modular Radio (DMR) functionality including HF and UHF Advanced Digital Waveform (ADW).<br />

3) CSRR equipment and integration efforts are procured under various contracts.<br />

4) FY 08/09 reflects Tech Refresh with no associated input/output.<br />

February 2004<br />

P-1 Shopping List-Item No 79- 11 of 15 Classification

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!