- Page 1 and 2:
Establishment of a biogas grid andi
- Page 3 and 4:
Title : Establishment of a biogas g
- Page 5 and 6:
DGC-report 2AppendicesAppendix 1: O
- Page 7 and 8:
DGC-report 42 Background2.1 A bioga
- Page 9 and 10:
DGC-report 62.2 Examined subjectsTh
- Page 11 and 12:
DGC-report 8DKK per year or 0,19 DK
- Page 13 and 14:
DGC-report 10Table 2Average market
- Page 15 and 16:
DGC-report 125 Gas quality and meas
- Page 17 and 18:
DGC-report 14crease in maintenance
- Page 19 and 20:
DGC-report 16Furthermore, the analy
- Page 21 and 22:
DGC-report 18Among the possible req
- Page 23 and 24:
DGC-report 208 Design of the biogas
- Page 25 and 26:
DGC-report 228.1.1 Alternative appl
- Page 27 and 28:
DGC-report 24to own and operate bio
- Page 29 and 30:
DGC-report 26The minimum gas requir
- Page 31:
Appendix 1Produktion og afsætningW
- Page 34 and 35:
2IndholdsfortegnelseSide1 Indlednin
- Page 36 and 37:
42 ProduktionspotentialeRinkøbing
- Page 38 and 39:
6400.000350.000Naturgasforbrug / m
- Page 40 and 41:
8Månedsforbrug i NG-ækvi. m 37.00
- Page 42 and 43:
10pr. kWh opgraderet gas) med stige
- Page 44 and 45:
opgraderingen. Det skyldes at til m
- Page 46 and 47:
14I stedet for at opgradere hele de
- Page 48 and 49:
Tabel 5. Effekt af sæsonvarieret b
- Page 50 and 51:
18me på kraftvarmeværker i Danmar
- Page 52 and 53:
20Figur 11. Princippet i geotermisk
- Page 54 and 55:
22Figur 13, Driftsfilosofi for det
- Page 56 and 57:
247 Referencer[1] Nedgradering af g
- Page 59 and 60:
DGC-notat 1/19Forøget biogasandel
- Page 61 and 62:
DGC-notat 3/19IndledningI Danmark a
- Page 63 and 64:
DGC-notat 5/19Figur 1. Energistyrel
- Page 65 and 66:
DGC-notat 7/19øgede samproduktion
- Page 67 and 68:
DGC-notat 9/19Figur 3. Varighedskur
- Page 69 and 70:
DGC-notat 11/19anvende gaslagre, en
- Page 71 and 72:
DGC-notat 13/19Biogas og elprodukti
- Page 73 and 74:
DGC-notat 15/19produktionen når el
- Page 75 and 76:
DGC-notat 17/19Figur 12. Bergnet me
- Page 77 and 78:
DGC-notat 19/19Referencer[1] Lokal
- Page 80 and 81:
DGC-notat 1/28Biogasnettet i Ringk
- Page 82 and 83:
DGC-notat 3/28IndledningNærværend
- Page 84 and 85:
DGC-notat 5/28komme korrosionsskade
- Page 86 and 87:
DGC-notat 7/28Note 1:Det svenske re
- Page 88 and 89:
DGC-notat 9/28nettet, blev testet h
- Page 90 and 91:
DGC-notat 11/28Siemens er blevet ko
- Page 92 and 93:
DGC-notat 13/28Tabel 1. Omkostninge
- Page 94 and 95:
DGC-notat 15/28Figur 2 GTP-filter f
- Page 96 and 97:
DGC-notat 17/28Sulfurex®fuldlast[8
- Page 98 and 99:
DGC-notat 19/28- Ultralydsmålere-
- Page 100 and 101:
DGC-notat 21/28Tabel 6. Forskellige
- Page 102 and 103:
DGC-notat 23/28Figur af flere typer
- Page 104 and 105:
DGC-notat 25/28Et emne, der har væ
- Page 106 and 107:
DGC-notat 27/28KontrolsystemFor at
- Page 108:
Appendix 4Økonomiske overvejelser
- Page 111 and 112:
SammenfatningI denne arbejdspakke e
- Page 113 and 114:
at etablere et antal biogasanlæg o
- Page 115 and 116:
højeste og mest stabile biogasafre
- Page 117 and 118:
værkets varmebehov og lagerkapacit
- Page 119 and 120:
Gaskøb: Gaspris består normalt af
- Page 121 and 122:
Reglerne i varmeforsyningsloven bet
- Page 123 and 124:
De er dermed forpligtede til at lev
- Page 125 and 126:
formidler kraftvarmeværkets bud ti
- Page 127 and 128:
efter en gaspris relateret til en o
- Page 129 and 130:
Biogas som brændsel er ikke identi
- Page 131 and 132:
incitament til biogasMuligheder Bes
- Page 133 and 134:
Figur 6: Fordelingskurve på døgnb
- Page 135 and 136:
3. Biogas som grundlast i det frie
- Page 137 and 138:
Gas- og elpris 2008-200970060050040
- Page 139 and 140:
Varmepris Biogaspris BiogasprisInve
- Page 141 and 142:
motor og turbineanlæg. Derudover f
- Page 143 and 144:
udgøre mellem ca. 355 og 410 kr/MW
- Page 145 and 146:
Bilag 1Værknavn Spjald 2009Årspro
- Page 147 and 148:
Bilag 3 - Driftsøkonomiske beregni
- Page 149 and 150:
Spjald 2008Biogas som grundlast mar
- Page 151 and 152:
Spjald 2008Biogas marked 150 % jan
- Page 153 and 154:
Spjald 2009Biogas som grundlast jan
- Page 155 and 156:
Spjald 2009Biogas grundlast 150 % j
- Page 157 and 158:
Bilag 4 - Driftsøkonomiske beregni
- Page 159 and 160: Ringkøbing 2008Biogas som grundlas
- Page 161 and 162: Ringkøbing 2008Biogas marked 150 %
- Page 163 and 164: Ringkøbing 2009Biogas som grundlas
- Page 165 and 166: Ringkøbing 2009Biogas grundlast 15
- Page 167: Appendix 5Ombygning af naturgasmoto
- Page 170 and 171: DGC-notat 2/18IndholdfortegnelseIND
- Page 172 and 173: DGC-notat 4/18IntroduktionFælles f
- Page 174 and 175: DGC-notat 6/18Samspil mellem biogas
- Page 176 and 177: DGC-notat 8/18ReceiverMotorLuftBræ
- Page 178 and 179: DGC-notat 10/18Wärtsilä har ingen
- Page 180 and 181: DGC-notat 12/18hvis andelen af natu
- Page 182 and 183: DGC-notat 14/18Hvis det antages, at
- Page 184 and 185: DGC-notat 16/18gældende for naturg
- Page 186 and 187: DGC-notat 18/18Referencer[ 1]http:/
- Page 190: Bilag 2.Jenbacher - Brændstofspeci
- Page 204 and 205: Motoren i Ådum.Budget - Ombygning
- Page 206 and 207: Motorene i Kloster.Budget - Ombygni
- Page 208 and 209: Motoren i Videbæk.Budget - Ombygni
- Page 212 and 213: WP-5BiogasnettetBaggrund.Da Ringkø
- Page 214 and 215: VærkBiogasforbrugNødvendigindfyre
- Page 216 and 217: PrisoverslagPå baggrund af HMN`s e
- Page 218 and 219: Som det fremgår er det udgangspunk
- Page 220 and 221: En sammenstilling af de forventede
- Page 222: Appendix 7Organisatoriske og aftale
- Page 225 and 226: 2ProjektbeskrivelseBioenergi Vest (
- Page 227 and 228: Det er forudsat at BeV a/s er det o
- Page 229 and 230: naturgasudbyder og dels at naturgas
- Page 231 and 232: anlægget i form af ind‐ og udpum
- Page 233 and 234: 3.4.3 Handel med gassenHandlen med
- Page 235 and 236: defineres som ét fællesanlægspro
- Page 237 and 238: Ansvar i forhold til uplanlagte sto
- Page 239 and 240: 4 Forhold til licitationslovgivning
- Page 241 and 242: Ulempen ved det begrænsede udbud e
- Page 243 and 244: 8. Hvis udbyder finder behov og gru
- Page 245 and 246: 55.1Biogaskvalitet og mængdeGaskø
- Page 247 and 248: Ansvaret for sæsonvariation bør l
- Page 249 and 250: Svovlindhold (H 2 S):Ikke over 250
- Page 251: Appendix 8Forretningsmodel og finan
- Page 254 and 255: SammendragArbejdspakke 7 leder frem
- Page 256 and 257: en for selskabet er fastlagt af Rin
- Page 258 and 259: Investeringi transmissionsnetI en b
- Page 260 and 261:
Tabel 3: Drift og vedligehold - bio
- Page 262 and 263:
Transmissionsindtægtt0,68Investeri
- Page 264 and 265:
Figur 4: Oversigt over etape 2 - Fo
- Page 266 and 267:
Pris pr. m3 fra FV/KV for opgradere
- Page 268 and 269:
TransmissionsindtægterSamledee dri
- Page 270 and 271:
I modelC er alle tallene de samme,
- Page 272 and 273:
es CO2-mål. En anden aftager kunne
- Page 274:
VurderingSom rammerne for Bioenergi