12.07.2015 Views

Rapport (alle typer) - Danish Gas Technology Centre

Rapport (alle typer) - Danish Gas Technology Centre

Rapport (alle typer) - Danish Gas Technology Centre

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Pris pr. m3 fra FV/KV for opgraderet gasPris pr. m3 til landmændTransmissionsindtægtt4,833,980,85Investering - Anlægog transmissionsnetInvestering vedr. etape 181.375.000105.000.00080.000.000400.000.00012.500.0009.150.000-42.000.000564.650.000Total investering646.025.000Investering - OpgraderingsanlægOpgraderingsanlæg (2stk.)<strong>Gas</strong>kompressor (2 stk.)123.000.00013.000.000136.000.000Investering vedr. etape 2Transmissionsnet (120km)Decentralt biogasanlæg (20*500 DE)Decentralt biogasanlæg (40*1500 DE)Decentralt biogasanlæg (1*2500 DE)Decentrale gasmålere (61 stk.)Reduktion af investering i transmissionsnet og kompres-sorstationerTotal investeringFinansielle omkostninger - Anlæg og transmissionsnetAfdragsperiode i årRenteSamlet årlig ydelse (annuitetsbetragtning)205% 551.838.717Finansielle omkostninger - OpgraderingsanlægAfdragsperiode i årRenteSamlet årlig ydelse (annuitetsbetragtning)155% 513.102.551DriftsudgifterAfregning af gas til landmændOpgraderingsudgifter- hele produktionDrift og vedligehold aftransmissionsnetDrift og vedligehold afanlægAdministration af køb/ /salg af gasSAP-systemAndre driftsudgifter (kontor, bil m.m.)ForsikringSamledee driftsudgifterr238.800.00026.400.0005.301.4295.333.333500.0001.000.0001.000.0000278.334.762DriftsindtægterIndtjening - opgraderet gasLeasingTransmissionsindtægterSalg af procesvarmeSamledee driftsindtægter238.800.00048.789.15051.000.0005.000.000343.589.150RKSK BiogasnetAfsluttende rapport14/22 1 st Mile, December 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!