Establishment of a biogas grid andi
- Page 3 and 4:
Title : Establishment of a biogas g
- Page 5 and 6:
DGC-report 2AppendicesAppendix 1: O
- Page 7 and 8:
DGC-report 42 Background2.1 A bioga
- Page 9 and 10:
DGC-report 62.2 Examined subjectsTh
- Page 11 and 12:
DGC-report 8DKK per year or 0,19 DK
- Page 13 and 14:
DGC-report 10Table 2Average market
- Page 15 and 16:
DGC-report 125 Gas quality and meas
- Page 17 and 18:
DGC-report 14crease in maintenance
- Page 19 and 20:
DGC-report 16Furthermore, the analy
- Page 21 and 22:
DGC-report 18Among the possible req
- Page 23 and 24:
DGC-report 208 Design of the biogas
- Page 25 and 26:
DGC-report 228.1.1 Alternative appl
- Page 27 and 28: DGC-report 24to own and operate bio
- Page 29 and 30: DGC-report 26The minimum gas requir
- Page 31: Appendix 1Produktion og afsætningW
- Page 34 and 35: 2IndholdsfortegnelseSide1 Indlednin
- Page 36 and 37: 42 ProduktionspotentialeRinkøbing
- Page 38 and 39: 6400.000350.000Naturgasforbrug / m
- Page 40 and 41: 8Månedsforbrug i NG-ækvi. m 37.00
- Page 42 and 43: 10pr. kWh opgraderet gas) med stige
- Page 44 and 45: opgraderingen. Det skyldes at til m
- Page 46 and 47: 14I stedet for at opgradere hele de
- Page 48 and 49: Tabel 5. Effekt af sæsonvarieret b
- Page 50 and 51: 18me på kraftvarmeværker i Danmar
- Page 52 and 53: 20Figur 11. Princippet i geotermisk
- Page 54 and 55: 22Figur 13, Driftsfilosofi for det
- Page 56 and 57: 247 Referencer[1] Nedgradering af g
- Page 59 and 60: DGC-notat 1/19Forøget biogasandel
- Page 61 and 62: DGC-notat 3/19IndledningI Danmark a
- Page 63 and 64: DGC-notat 5/19Figur 1. Energistyrel
- Page 65 and 66: DGC-notat 7/19øgede samproduktion
- Page 67 and 68: DGC-notat 9/19Figur 3. Varighedskur
- Page 69 and 70: DGC-notat 11/19anvende gaslagre, en
- Page 71 and 72: DGC-notat 13/19Biogas og elprodukti
- Page 73 and 74: DGC-notat 15/19produktionen når el
- Page 75 and 76: DGC-notat 17/19Figur 12. Bergnet me
- Page 77: DGC-notat 19/19Referencer[1] Lokal
- Page 81 and 82: DGC-notat 2/28IndholdIndledning ...
- Page 83 and 84: DGC-notat 4/28Beskrivelse af udford
- Page 85 and 86: DGC-notat 6/28turgasnettet. Resulta
- Page 87 and 88: DGC-notat 8/28Kategori 1 og 2 rørs
- Page 89 and 90: DGC-notat 10/28til konvertering af
- Page 91 and 92: DGC-notat 12/28Som det fremgår af
- Page 93 and 94: DGC-notat 14/28Biologisk svovlrensn
- Page 95 and 96: DGC-notat 16/28Figur 3 Siloxa-proce
- Page 97 and 98: DGC-notat 18/28fjerne svovlen hos f
- Page 99 and 100: DGC-notat 20/28Figur 8 IMETER’s r
- Page 101 and 102: DGC-notat 22/28dråber, der så med
- Page 103 and 104: DGC-notat 24/28strument, der kan kl
- Page 105 and 106: DGC-notat 26/28ningsanlæg (tørrin
- Page 107 and 108: DGC-notat 28/28Kildeliste/1/Hydroge
- Page 110 and 111: WP3: Økonomiske overvejelser om bi
- Page 112 and 113: Resultater 2008-2009 RingkøbingNat
- Page 114 and 115: gasprisaftale, som er væsentlige i
- Page 116 and 117: Det variable driftsregnskab for et
- Page 118 and 119: kraftvarmeanlægget producerer elle
- Page 120 and 121: Ved elsalg på det frie elmarked, s
- Page 122 and 123: Ved opgørelse af substitutionspris
- Page 124 and 125: For ca. 10 år siden blev der etabl
- Page 126 and 127: at indgå en variabel gaskontrakt,
- Page 128 and 129:
iogas. Den mistede rabat vil forrin
- Page 130 and 131:
lageret er større, men på den and
- Page 132 and 133:
langsigtede muligheder som er beskr
- Page 134 and 135:
iogasforbrug til motor og evt. kede
- Page 136 and 137:
ResultaterSpjaldResultaterne af Ene
- Page 138 and 139:
600Biogaspriser5004003002001000Biog
- Page 140 and 141:
700Biogaspriser6005004003002001000B
- Page 142 and 143:
ScenarieresumeJusterbare celler:Mis
- Page 144 and 145:
• Ved fastlæggelse af den omkost
- Page 146 and 147:
Bilag 2Værknavn Ringkøbing 2009Å
- Page 148 and 149:
Spjald 2008Biogas som grundlast jan
- Page 150 and 151:
Spjald 2008Biogas last 150% fast af
- Page 152 and 153:
Spjald 2009Naturgas grundscenarie j
- Page 154 and 155:
Spjald 2009Biogas som grundlast mar
- Page 156 and 157:
Spjald 2009Biogas marked 150 % jan
- Page 158 and 159:
Ringkøbing 2008Biogas som grundlas
- Page 160 and 161:
Ringkøbing 2008Biogas last 150% fa
- Page 162 and 163:
Ringkøbing 2009Naturgas grundscena
- Page 164 and 165:
Ringkøbing 2009Biogas som grundlas
- Page 166 and 167:
Ringkøbing 2009Biogas marked 150 %
- Page 169 and 170:
DGC-notat 1/18Ombygning af naturgas
- Page 171 and 172:
DGC-notat 3/18IndledningI Danmark e
- Page 173 and 174:
DGC-notat 5/18Biogas og naturgasFor
- Page 175 and 176:
DGC-notat 7/18Åbenkammersystemet e
- Page 177 and 178:
DGC-notat 9/18Andre svovlforbindels
- Page 179 and 180:
DGC-notat 11/18til halogener svarer
- Page 181 and 182:
DGC-notat 13/18• Opgradering af P
- Page 183 and 184:
DGC-notat 15/18WärtsiläOmbygninge
- Page 185 and 186:
DGC-notat 17/18Hvis røggastemperat
- Page 187:
Bilag 1.Rolls Royce - Brændstofspe
- Page 203 and 204:
Bilag 3.Ombygning af Jenbacher moto
- Page 205 and 206:
Som smøreolie skal der anvendes Mo
- Page 207 and 208:
Som smøreolie skal der anvendes Mo
- Page 209 and 210:
Dette betyder, at hvis man ikke kø
- Page 212 and 213:
WP-5BiogasnettetBaggrund.Da Ringkø
- Page 214 and 215:
VærkBiogasforbrugNødvendigindfyre
- Page 216 and 217:
PrisoverslagPå baggrund af HMN`s e
- Page 218 and 219:
Som det fremgår er det udgangspunk
- Page 220 and 221:
En sammenstilling af de forventede
- Page 222:
Appendix 7Organisatoriske og aftale
- Page 225 and 226:
2ProjektbeskrivelseBioenergi Vest (
- Page 227 and 228:
Det er forudsat at BeV a/s er det o
- Page 229 and 230:
naturgasudbyder og dels at naturgas
- Page 231 and 232:
anlægget i form af ind‐ og udpum
- Page 233 and 234:
3.4.3 Handel med gassenHandlen med
- Page 235 and 236:
defineres som ét fællesanlægspro
- Page 237 and 238:
Ansvar i forhold til uplanlagte sto
- Page 239 and 240:
4 Forhold til licitationslovgivning
- Page 241 and 242:
Ulempen ved det begrænsede udbud e
- Page 243 and 244:
8. Hvis udbyder finder behov og gru
- Page 245 and 246:
55.1Biogaskvalitet og mængdeGaskø
- Page 247 and 248:
Ansvaret for sæsonvariation bør l
- Page 249 and 250:
Svovlindhold (H 2 S):Ikke over 250
- Page 251:
Appendix 8Forretningsmodel og finan
- Page 254 and 255:
SammendragArbejdspakke 7 leder frem
- Page 256 and 257:
en for selskabet er fastlagt af Rin
- Page 258 and 259:
Investeringi transmissionsnetI en b
- Page 260 and 261:
Tabel 3: Drift og vedligehold - bio
- Page 262 and 263:
Transmissionsindtægtt0,68Investeri
- Page 264 and 265:
Figur 4: Oversigt over etape 2 - Fo
- Page 266 and 267:
Pris pr. m3 fra FV/KV for opgradere
- Page 268 and 269:
TransmissionsindtægterSamledee dri
- Page 270 and 271:
I modelC er alle tallene de samme,
- Page 272 and 273:
es CO2-mål. En anden aftager kunne
- Page 274:
VurderingSom rammerne for Bioenergi