12.07.2015 Views

Rapport (alle typer) - Danish Gas Technology Centre

Rapport (alle typer) - Danish Gas Technology Centre

Rapport (alle typer) - Danish Gas Technology Centre

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DGC-report 228.1.1 Alternative application of the biogasHMN Naturgas I/S examined the possibilities of upgrading and injecting theentire biogas production into the natural gas grid. It turned out that the 40bar distribution grid in the municipality has sufficiently high capacity totake the entire biogas production.This solution means that the biogas grid can be established in sm<strong>alle</strong>r dimensionsand, in addition, parts of the grid can be omitted. Upgrading allbiogas also means that the modifications at the CHP plants including conversionand replacement of gas engines will be superfluous, as they will besupplied as they are today. The result will be significantly lower investmentscosts. Instead of 347 mio. DKK, as shown above, the required investmentwill be 255 mio. DKK - including upgrading units. However, operationof the upgrading plants will lead to significantly higher operationand maintenance costs. The feasibility of the two solutions is described inSection 10.For further information on grid design please refer to Appendix 8.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!